Tender Available Date: Wednesday, April 15, 2026.Tender Closing Date: Wednesday, May 13, 2026.Pre-Tender Meeting: May 5, 2026 At 1:00 P.M. To 2:00 P.M. Mst Virtually Over Ms Teams. Attendees Will Need To Join The Meeting Through The Following Link: Https://Can01.Safelinks.Protection.Outlook.Com/Ap/T-59584E83/?Url=Https%3A%2F%2Fteams.Microsoft.Com%2Fmeet%2F210128209348945%3Fp%3D7rhh6wnzslubymkdo0&Data=05%7C02%7Cikhtiyar.Mammadov%40Gov.Ab.Ca%7Cb75225f90a4d4d865ea408de9b2e612c%7C2bb51c06af9b42c58bf53c3b7b10850b%7C0%7C0%7C639118820651829250%7Cunknown%7Ctwfpbgzsb3d8eyjfbxb0eu1hcgkionrydwusilyioiiwljaumdawmcisilaioijxaw4zmiisikfoijoitwfpbcisilduijoyfq%3D%3D%7C0%7C%7C%7C&Sdata=Kz4tbkl8pcykqpf%2Fvziy%2Byi8zf06ijxnqm8zeelms2o%3D&Reserved=0Project Inquiries: Ikhtiyar Mammadov, Project Procurement Officer, Alberta Transportation And Economic Corridors. E-Mail:
[email protected] Will Only Be Received By Email At
[email protected], Before 2:01:00 P.M., For Construction Of The Following Work:Tnd0025017asphalt Concrete Pavement (Acp), Bridge Culvert Replacement, Cold Milling, Erosion Control, Granular Base Course (Gbc), Pavement Markings, Seeding, Installation Of Storm Sewer, Street Light Installation, Subgrade Preparation And Other Workhwy 27:06/22:20/584:02, Intersection #990 Roundaboutcentral Regionapproximate Quantities:1 Lump Sum Traffic Accommodation25,300 Cubic Metre Common Excavation36,100 Cubic Metre Borrow Excavation - Contractor Supplied23,890 Tonne Granular Base Course Des. 2 Class 256,190 Tonne Asphalt Concrete Pavement – Eps Mix Type H1 (Pg 64-34)3,820 Tonne Asphalt Concrete Pavement – Eps Mix Type S3 (Pg 64-34)2,304 Metre Curb And Gutter (500 Mm Semi-Mountable)598 Square Metre Central Concrete Truck Apron (220 Mm Thick, Pigmented)1,496 Square Metre Solid Concrete Splitter Island (220 Mm Thick)1,530 Metre Trenching And Backfilling22 Unit Removal And Salvage Of Existing Standards25 Unit Cast-In-Place Concrete Street Light Base - Supply And Install22 Pole Salvaged Street Light Standard - Install1,450 Cubic Metre Excavation - Structural (B.F. 83272)1 Lump Sum Temporary Water Accommodation121.2 Metre Csp With Couplers - Supply (1600 Mm Diameter)121.2 Metre Csp - Assembly (1600 Mm Diameter)1,213 Metre Backfill - Crushed Aggregate Des. 2 Class 25 (B.F. 83272)Contractor To Supply All Materials.Contract Completion Date: October 30, 2026.