GTR 111868827
Tenders Are Invited For Installation Services Of Turbines - Balancing Of Low-Pressure Turbine Rotors
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
111868827
Tendering Authority
Subscribe to view
Tender No
260212-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Installation Services Of Turbines - Balancing Of Low-Pressure Turbine Rotors
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
18-05-2026
Closed
Work Detail
Installation Services Of Turbines - Balancing Of Low-Pressure Turbine Rotors. 1. The Contractor (Contractor) Is Responsible For The Client (Client), Paks Nuclear Power Plant 1-4. Dynamic Balancing Of Block Low-Pressure Turbine Vacuum Chamber Rotors (Further On Balancing Or Balancing), Transport Of Rotors And Balance Weights. Scope Of The Task: 1 Block Quantity Each Year, 2 Rotors Per Block, Balancing A Total Of 8 Rotors On The 4 Blocks 2026-2029. Year. 2. Tasks To Be Performed 2.1.1. The Contractor Is Responsible For The Delivery Of The Rotors. 2.1.2. Fixing And Packaging Of The Turbine Rotors Is The Responsibility Of The Customer During Delivery And The Contractor During Return. During The Return Of The Rotor Parts, The Fixing Of The Rotor Parts In The Frames Must Be Carried Out By The Contractor In Addition To The On-Site Supervision Of The Customer. 2.1.3. The Lifting Of The Transport Cranes And Rotors Onto The Contractors Transport Equipment In The Operational Area Of The Paks Nuclear Power Plant, As Well As Their Lowering In The Operational Area Of The Paks Nuclear Power Plant, Is Carried Out By The Customers Specialists. 2.1.4. During The Delivery Of The Rotor Parts, The Customer Secures The Rotor Parts In The Buckets According To Drawing Number Kg-11562. 2.1.5. The Execution Of The Task - Balancing - Takes Place At The Contractors Premises, Under The Continuous Technical Control Of The Customers Representatives. 2.1.6. At The Contractors Site, After The Removal Of The Rotor Parts, The Contractor Visually Inspects The Solder Joints Of The Bandage Pipes And Spacer Rings. In The Event Of An Error, He Will Repair The Soldering According To The Repair Technology Provided By The Customer. 2.1.7. Balancing Weights Are Provided By The Customer. 2.1.8. It Is The Responsibility Of The Contractor To Provide The Necessary Bearings, Drive Connection And Other Tools For The Execution Of The Balancing Work. 2.1.9. The Customer Provides The Opportunity To Take The Dimensions Necessary For The Production Of The Drive Connection In The Paks Nuclear Power Plant Plant Area, After The Removal Of The Rotor Parts, From The 5Th Calendar Day Before The Delivery Of The 1St Rotor Part. 2.1.10. At 3,000 Rpm, The Rotors Must Be Balanced To A Level That Allows Over-Revving At 3,360 Rpm. The One-Minute Overspeed Must Be Performed At An Overspeed Protection Value Of 3360 Rpm. 2.1.11. After The Last Balancing, The Value Of The Bearing Vibration At 3000 Rpm Should Not Exceed 2.8Μm During Rotation, And At The Overspeed Protection Speed Should Not Exceed 10Μm According To Iso 1940-1 G1 Or Equivalent Standard. 2.1.12. After Balancing, The Dynamic Reaction Force Of The Bearings At 3,000 Rpm Cannot Be Greater Than 2,000 N. 2.1.13. Fulfillment Of Excess Commitment: (Undertaken, The Value Of Residual Balance Error Per Bearing Is Given In N As An Evaluation Sub-Criteria) Balancing Of The Rotors, 2.1.12. In Order To Achieve A Residual Reaction Force Per Bearing Lower Than 2000 N As Specified In Point The Minimum Value Of The Commitment Can Be 750 N. 2.1.14. The Last One
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
6b0f7a33-582a-4f9d-a49b-ecdba4a63064.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.