Construction Work For Art And Cultural Buildings – Schauspielhaus Zurich, Schiffbau Halle – Replacement Of The Upper Machinery. Replacement Of The Upper Machinery In The Hall Of The Schiffbau Venue In The Schauspielhaus Zurich With The Following Scope: Dismantling - 8 Pieces Of Chain Hoists 1,000 Kg, 10 Pieces Of Chain Hoists 320 Kg, 2 Pieces Of Helmet Rails On The Crane Bridge, Switchgear, Electrical Installation And Control Points. Conversion - 2 Pieces Of Mobile Portal Bridges Into Crane Bridges Including Reinforcement Of The Supporting Structure. New Equipment - Frame For Accommodating Control Cabinets As A Steel Structure In A Hallway. Reinforcement Of 6 Crane Bridges, Helmet Rails On Both Sides With Trolleys On 8 Crane Bridges With Outriggers To Accommodate Chain Hoists. 8 Crane Bridge Drives With Position Detection, 32 Point Pull Winches 500 Kg, With Trolleys For Crane Bridges, Computer-Aided Stage Control In Requirement Class Sil 3, Electrical Installation And Control Points Each In Accordance With En 17206.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.