1. The Subject Of The Order Is: Reconstruction And Renovation Of The Interior Of The Primary School In Biskupice2. The Subject Of The Order Includes Construction, Sanitary And Electrical Works, Including: 1) Dismantling Of Doors, 2) Dismantling Of Fittings, 3) Demolition Of Existing Partition Walls, 4) Removal Of Damaged Plasters On Existing Walls And Ceilings, 5) Dismantling Of Floor Layers (Communications - Terrazzo, Bathrooms - Ceramic Tiles, Classrooms - Parquet). 6) Enlargement Of Door Openings And Installation Of Lintels Prefabricated Steel,7) Construction Of New Partition Walls,8) Construction Of Electrical Installations, - Deactivation Of Existing Electrical Installations In The Rooms Covered By The Study, - Dismantling Of Existing Lighting Fixtures And Switches, - Dismantling Of Existing Plug Sockets, - Dismantling Of Existing Switchboards, - Deactivation Of Existing Electrical Cables, - Construction Of Internal Lighting Installations, - Construction Of Interior Installations Of Plug Sockets, - Construction Of Installations Lan, - Construction Of Facility Switchboards: Trg, Trp, Tr1, Trk, Tr1k - Construction Of A Fire Protection Power Switch - Preparation Of A Meter Board For Moving The Measuring System - Moving The Measuring System Outside The Building 9) Construction Of Water And Sewage Installations, - Disassembly And Assembly Of The Internal Water Supply System With Fittings And White Assembly, - Disassembly And Assembly Of The Internal Sanitary Sewage System, - Disassembly And Assembly Of The Central Heating System Within The Scope Of The Study, 10) Repairs Of Plasters On Existing Walls And Ceilings,11) Plastering Of New Partition Walls (Hardened Gypsum Plaster - Machine-Made) And Laying Of Plasters,12) Construction Of New Ventilation Chimneys, Exit Above The Roof Through The Ridge Of The Building,13) Leveling Of Floors,14) Execution Of Floor Layers15) Execution Of Ceramic Tiles In Hygienic And Sanitary Rooms (Floors And Walls For Full Height),16) Installation Of Internal Doors,17) Painting Of Walls And Ceilings,18) White Assembly,3. Organization Of Construction Works: 1) Construction Works Should Be Carried Out During The Summer And Holiday Periods And During Breaks (E.G. Winter). 2) The Planned Date Of Commencement And Execution Of Construction Works Is July 1, 2026. 3) The Ordering Party Expects Systematic And Quick Implementation Of The Task In A Way That Does Not Interfere With The Operation Of The Facility. 4) The Ordering Party Also Allows Construction Works To Be Carried Out During The School Year Or Outside School Opening Hours, However, This Requires The Written Consent Of The School Principal And Prior Arrangement Of The Schedule With The School Principal. 5) Note: The Contractor Is Obliged To Agree On The Interior Colors With The School Principal Before The Purchase And Commencement Of Works. 6) The Contractor Is Obliged To Agree On The Organizational Details Related To The Implementation Of Works During The School Year
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.