Prequalification Phase Subcontract 04 Implementation Of Integration Work . Descriptionthis Procurement Will Include Both The Purchase Of Material And The Execution Of The Following Work: Installation Of Steam And Condensate Lines From The Existing Waste Incineration Plant To The Interface With The Carbon Capture Plant At Klemetsrud (Carbon Capture Plant - Ccp) On The Outside Of The South-East Corner Of K3. Installation Of Round-Trip District Heating Lines Between The Return Line (From The Center) For K3 To The Interface With Ccp On The Outside Of The South-East Corner Of K3. Installation Of Demining Water Line (From Ccp), Process Drain (From Ccp) And Compressed Air With Connections At Both Ends. 2 Analysis Stations For The Analysis Of Steam, Condensate And Feed Water Will Also Be Installed At The Existing Plant, And 2 Dosing Stations For Dosing The Chemicals Trisodium Phosphate And Ammonia Water For K1 And K2. All Systems Shall Be Tested Prior To Handover. The Request Concerns An Execution Contract. A Contract Will Be Entered Into Based On Ns 8405 Norwegian Building And Construction Contract, With The Changes And Additions Made In Hafslunds Template For Contract Documents. The Price Model Is A Combination Of Fixed Price And Quantity Regulation. Start Of Assembly On The Construction Site Is Estimated For October 2026 And Takeover Of Contract Workers Is Estimated For March 2027.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.