Railway Points – Switch Renewal At Südbahnhof – Here: Switch Delivery. Switch Tracks For 3 Vignol Switches Including Wheel Handlebars, Steel Box Sleepers In The Locking Compartment, Clamp Fasteners, Continuous Ribbed Plates On The Frogs, Wheel Control Bar Plates, Ribbed And Sliding Chair Plates In The Area Of The Tongue Devices As Well As Ski12 Tension Clamps, Hook Screws Hs32-55, Spring Washer Fe6 And Soft Zws For The Entire System As Well As Sleeper Screws Ss8-160 For All The Plates Supplied. Crossing System Consisting Of Crossings No. 2, 4 And 6. Lanes Of The Above-Mentioned Crossings In A Special Construction, Grooved Design Including The Connecting And Connecting Tracks, Ribbed Plates As Well As Tension Clamps Skl12, Hook Screws Hs32-55, Spring Washer Fe6 And Soft Zws For The Entire System As Well As Sleeper Screws Ss8-160 For All Plates Supplied. The Scope Of Delivery Includes 16 Pieces Of Profile Transitions On 49E1.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.