1 Invitation To Bid.1 Sealed Bids Will Be Received By Chilliwack School District #33 For A:École Cheam Elementary School Rooftop Unit Upgrade (Phase 2)2 Submission Of Bid.1 Tenders Filled Out On The Stipulated Price Bid Form Contained In The Project Specificationand Marked École Cheam Elementary School Rooftop Unit Upgrade (Phase 2) Shallbe Received At Chilliwack School District Facilities (44877 Yale Road West) To Theattention Of Mr. Tom Nichols, Facilities Manager At
[email protected], Nolater Than 2:00 Pm On April 30, 2026 (According To The Clock On The Wall In Theoffice Reception Area). The School District Will Also Accept Submissions Madethrough The B.C. Bid Portal..2 Offers Submitted After The Indicated Closing Time Will Be Returned To The Bidder Unopened..3 Bids Received Prior To The Indicated Closing Time Will Be Opened Publicly After Recording Ofenvelopes Received. Bids Received Will Be Reviewed By The School District With Theconsultant Prior To Award..4 Subject To The Provisions Of Clause 7 (Revision Of Bid) Of The Instructions To Bidders,Previously Submitted Bids May Be Revised By Delivery Of A Signed Letter. Revised Bids Willonly Be Accepted If Submitted On A Copy Of Appendix F Of The Stipulated Price Bid Form,As Attached In This Specification. No Faxed Revisions Of Bid Will Be Accepted..5 Bids Shall Be Accompanied By A Bid Bond In An Amount Equal To Ten Percent (10%) Of Thebid Price. Use Bid Bond Form Ccdc #220-2002..6 Bids Shall Remain In Effect For A Period Of Sixty (60) Days From The Time Of Bid Closing..7 Provide Base Contract Price And Two (2) Separate Prices, As Per The Breakdown Noted Onthe Mechanical Drawings. Separate Price #1 Will Proceed On A Schedule And Cost Basisand Will Be Determined In August.3 Clarifications And Addenda During The Bidding Period.1 Inquiries During The Tender Period May Be Directed To The Appropriate Consultant But Must Becopied To The Prime Consultant. No Oral Clarifications Will Be Issued. All Changes To Thecontract Will Be Issued In The Form Of Written Addenda..2 Discrepancies, Omissions, Ambiguities, Or Conflicts In The Contract Documents Must Bebrought To The Attention Of The Consultant. The Consultant Will Review The Questions And Willissue Addenda As Required.4 Completion Of The Work.1 The Work Must Attain Substantial Completion No Later Than August 21, 2026 And Totalcompletion By September 4, 2026.Sd-33 Chilliwack Bc 00 00 10École Cheam Elementary Roof Top Unit Upgrade Invitation To Bidrpe Project # 25154-M Page 2 Of 2Rocky Point Engineering Ltd.5 Mandatory Site Visit.1 The Site Visit Is Mandatory For Contractors Intending To Act As Prime Contractors..2 As The Project Primarily Involves Mechanical Work; Mechanical Contractors Are Invited To Bidas Prime Contractors. In The Event Contractors Who Are Not Qualified To Carry Out Themechanical Installation Work Intend To Bid As Prime Contractors, They Shall Be Accompaniedon The Site Visit By The Mechanical Contractor They Intend To Carry As A Sub-Contractor..3 The Person Attending The Mandatory Walkthrough Must Be A Principal Of The Firm, Estimatoremployed By The Firm, Or A Ticketed Gas, Pipe Or Sheet Metal Tradesman, With Valid Tqnumber, Indicative Of Competency In Mechanical Systems Installation And An Understandingof The Project Requirements Described By The Owner And Consultant..4 The Site Tour Is Not Mandatory For Other Sub-Contractors..5 Mandatory Site Visit Will Be Held On April 17, 2026 (Friday) At 10:30 Amfurther Project Related Questions Can Be Directed To Prime And Mechanical Consultant:Rocky Point Engineering208-20171 92A Avenuelangley, Bc V1m 3A5contact #1: Kenneth Sotelephone: (604) 887-7779Fax: (604) 888-7719Email:
[email protected] #2: Richard Corra, P.Eng.Telephone: (604) 887-7779Fax: (604) 888-7719Email:
[email protected]