Local Administration, Executive Project, Demolitions And Removals, Inc Loading, Transport And Unloading In Licensed Area, Land Clearing, Demolition And Fragmentation Of Rock Blocks, 04/14/2026 - 17:26:00, 04/14/2026 - 17:26:02, 04/14/2026 - 17:26:03, 14/04/2026 - 17:26:04, 14/04/2026 - 17:26:05, Work Location, Signs, Sidings And Sheds, Temporary Installations Water, Sewage And Energy, Scaffolding, Primary Protection, Guardrails And Others, Cargo Elevator And Material Lifting, Execution Of 14 Piles Including Tests And Load Tests, Execution Of 15 Piles Including Tests And Load Tests, Blocks And Pillars (17 Units): Including Excavation, Drainage, Concrete, Formwork, Steel And Backfill, Straps (23 Units): Including Excavation, Slabs 1St Floor (12 Units): Including Excavation, Buildings Adjacent: Garbage, Pumps, Guardhouse, Substation, Gas And Others, Waterproofing Of Foundations And Attached Buildings, Pillars 1St To 2Nd Floor (15 Units) And Stairs - Including, Form And Steel, Beams 2Nd Floor (17 Units) - Including, Slabs 2Nd Floor (10 Units) - Including, Pillars 2Nd To 3Rd Floor (15 Units) And Stairs - Including, Beams 3Rd Floor (17 Units) - Including, Slabs 3Rd Floor (10 Units) - Including, Pillars 3Rd To 4Th Floor (13 Units) And Stairs - Including, Beams 4Th Floor (14 Units) - Including, Slabs 4Th Floor (10 Units) - Including, Pillars 4Th Floor For Coverage And Stairs - Including, Covering Pillars For Reservoir And Platband - Including, Cover Beams (12 Units) - Including, Reservoir Beams And Platband - Including, Cover Slabs, Reservoir And Platband - Including, Masonry And Other Gap Closing Systems - Environments On The 1St Floor, Masonry And Other Gap Closing Systems - Environments On The 2Nd Floor Floor, Masonry And Other Gap Closing Systems - 3Rd Floor Environments, Masonry And Other Gap Closing Systems - 4Th Floor Environments, Masonry And Other Gap Closing Systems - Roof Platbands, Technical Slabs, Barrel, Pump House And Reservoirs, Wooden Frames 1St And 2Nd Floors, Wooden Frames 3Rd And 4Th Floors, Plastering And Painting Of Wooden Frames, Metal Frames, Including Glass - 1St And 2Nd Floors, Including Glass - 1St Floor, 2Nd Floor. And Roof, Painting On Metal, Including Anti-Corrosion Protection, Metal Structure For Roof Cover - Roof 1, Metal Structure For Roof Cover - Roofs 2, 3 And 4, Thermoacoustic Metal Roofing, Including Flashings, Drip Pans, Chapins And Gutters - Roof - Roof 1, Chaps And Gutters - Roof - Roof 2, Waterproofing Of Covered Slabs, Waterproofing Of Uncovered Slabs, Plating Ceilings And Walls 1St And 2Nd Floor, Plating Ceilings And Walls Of The 3Rd And 4Th Floor, Plating Platbands Of Roofs, Technical Areas, Barrel And Reservoirs, Plastering Walls And Ceilings Of The 1St And 2Nd Floor, Plastering Walls Of The 3Rd And 4Th Floor, Plastering Walls And Ceilings 1St And 2Nd Floors, Plastering Walls And Ceilings 3Rd And 4Th Floors, Plastering Roof Platbands, Waterproofing Wet Areas, Ceramic Coatings 1St And 2Nd Floors, Ceramic Coatings 3Rd And 4Th Floors, Protection Of Walls Against Furniture Impacts, Ceilings/Recesses In Rooms On The 1St And 2Nd Floors, Linings/Recesses Rooms On The 3Rd And 4Th Floors, Aluminum Coating, Metallic Brises, Vinyl Floors Including Regularization, Granite And Porcelain Floors, Sills, Skirtings And Sills, Cemented Floors