electrical Contractor At Frier Vest Harbor Terminal . Descriptionthe Electrical Contract Is Carried Out As A Turnkey Contract According To Ns 8407, Based On The Attached Functional Description. When The Contract Is Entered Into, The Contract Is Scheduled To Be Transferred To The General Contractor For Renovation Of The Terminal Area - Phase 1. General Contractor Phase 1 Establishes Trenches, Draw Pipes/Cable Routes And Other Infrastructure In The Ground, Delivers Technical Houses And Installs Light Masts (Interface With Electricity). The Electrical Contractor Designs And Specifies Requirements For This Infrastructure, Verifies That The Solutions Are Suitable, And Alerts In The Event Of Deficiencies/Deviations. The Electrical Contractor Delivers Complete Electrical Installations In Accordance With The Functional Description, Including Cabling, Termination, Assembly, Testing And Commissioning, As Well As Installations In Technical Buildings And Connections To Light Masts. Building-Related Deliveries, Foundations, Draft Pipes In The Ground And Mechanical Mast Assembly Are Not Included. Participation In Coordination/Interface Meetings And Coordination With The General Contractor, Other Contractors, Builder And Network Owner Must Be Expected. Necessary Adaptations Of Guide Ways For A Complete And Compliant Installation Are Included. Project Planning Starts After Contract Award; Start Of Installation Work Is Planned For September 2026.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.