The Construction Project Includes The Production Of The Heat Supply And Heating Technology As Well As The Sanitary Systems. 4X Monoblock Air-Water Heat Pump 40 Kw, 1X District Heating Transfer Station 200 Kw For Integrating Existing Local Heating. 1X Buffer Tank 2,000 L, 3X Buffer Tank 500 - 1,000 L, Modular Heating Distributor With Feed Module Dn80 + 6X Heating Circuit Module Dn25 To Dn50, Various. High Efficiency Heating Pumps Control And Shut-Off Valves, Stainless Steel + Carbon Steel Heating Pipes, Insulation Work On Heating Pipes Fresh Water Station As A 2-Part Cascade P = 300 Kw, 35X Floor Inlet, 4X Box Gutter Showers, 21X Shower Panel Mineral Cast, 7X Washbasin, 11X Toilet, 3X Urinal, Hygiene Management System, Control And Shut-Off Fittings, Approx. 295 M Wastewater Pipes Made Of Pe, Approx. 670 M Pipes Of Drinking Water Kw/Ww Made Of Stainless Steel
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.