rehabilitation Sæterstidammen . Descriptionrehabilitation Of Sæterstidammen. In Essence, The Following Measures Are Planned: • Demolition Of The Existing Frost Wall And Reconstruction Of A New Frost Wall. • All The Pillars Must Be Reinforced With External Casting And New Anchor Bolts In The Rock On The Downstream Side. • A New Arrangement For Water Level Measurement Is Established. A Manual Measuring Scale Is Mounted, Which Is Placed Vertically On The Upstream Side Of The Dam. • Injection Works In Rock By The Pillar Towards The Spillway. • Cracked Pavement On Footpaths Is Removed And Concrete Damage Repaired. • Vegetation Along The Dams Downstream Side Is Removed, So That The Concrete/Rock Transition Is Exposed. This Is To Ensure The Possibility Of Inspection Along The Entire Dams Transitions To Rock. • Rehabilitation Of The Valve Chamber: O Dismantling Of The Existing Intake Arrangement Downstream Of The Dam Plate. Establishment Of A New Intake Arrangement, Including Valves And Associated Components. O Demolition Of The Existing Floor On The Ground And Re-Establishment Of A New Floor On The Ground. O Dismantling The Existing Cut/Blocked Tap Pipe And Drain Line. Re-Established With New Pipes And Components.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.