GTR 111673459
Tenders Are Invited For Engineering Design Services For The Construction Of Civil Engineering Works - Preparation Of Complete Design Documentation Along With Obtaining Administrative Decisions Necessary To Carry Out Construction Works Carried Out In The Rudziniec Forest District As Part Of The Project Entitled Comprehensive Project For The Adaptation Of Forests And Forestry To Climate Change - Small Retention And Counteracting Water Erosion In Lowland Areas - Continuation (Mrn3)
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
111673459
Tendering Authority
Subscribe to view
Tender No
245531-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Engineering Design Services For The Construction Of Civil Engineering Works - Preparation Of Complete Design Documentation Along With Obtaining Administrative Decisions Necessary To Carry Out Construction Works Carried Out In The Rudziniec Forest District As Part Of The Project Entitled Comprehensive Project For The Adaptation Of Forests And Forestry To Climate Change - Small Retention And Counteracting Water Erosion In Lowland Areas - Continuation (Mrn3)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
15-05-2026
Closed
Work Detail
Engineering Design Services For The Construction Of Civil Engineering Works - Preparation Of Complete Design Documentation Along With Obtaining Administrative Decisions Necessary To Carry Out Construction Works Carried Out In The Rudziniec Forest District As Part Of The Project Entitled Comprehensive Project For The Adaptation Of Forests And Forestry To Climate Change - Small Retention And Counteracting Water Erosion In Lowland Areas - Continuation (Mrn3). The Subject Of The Order Is The Preparation Of Complete Design Documentation (Hereinafter Referred To As The Documentation) Together With Obtaining Opinions, Arrangements And Administrative Decisions Required By The Provisions Of The Construction Law, As Well As Performing Authors Supervision For The Following Task: Task Number: 02-25-1.1-01 - Reconstruction Of The Reservoir In The Trachy Forest Division, Section 624. The Subject Of The Order Is Divided Into The Following Stages: Stage I - Preparation Of Complete Documentation Along With Obtaining A Final Decision On The Building Permit Or Confirmation Of The Lack Of Grounds To Raise An Objection To The Submitted Works Notification. Stage Ii - Carrying Out Authors Supervision In The Scope Of Compliance Of Construction Works With The Documentation - From The Date Of Commencement Of Construction Works Continuously Until The Final Acceptance And Obtaining An Occupancy Permit. The Subject Of The Order Must Be Completed Within The Following Deadlines: Stage I: 12 Months From The Date Of Conclusion Of The Contract Stage Ii: From The Date Of Commencement Of Construction Works Continuously Until The Final Acceptance And Obtaining An Occupancy Permit, But No Longer Than Until December 31, 2028 (The Indicated Date Is Related To The Expiry Of The Settlement Deadline For The Project Co-Financing Contract) Stage I - Preparation Of Complete Project Documentation Development Of Documentation Design Is Aimed At Obtaining The Necessary Opinions, Arrangements, Permits And All Administrative Decisions Required By Law, Necessary For The Execution Of Facilities And Construction Works In Accordance With The Design Documentation, Preparing A Description Of The Subject Of The Construction Works Contract And The Basis For Determining The Value Of The Contract For The Execution Of Facilities And Construction Works In Accordance With The Design Documentation, Preparing A Construction Design As The Basis For The Execution Of Facilities And Construction Works In Accordance With The Design Documentation And The Basis For The Operation Of The Facilities. The Scope Of The Subject Matter Of The Order Includes The Development Of Complete Design And Cost Estimate Documentation In Polish In Accordance With The Guidelines For The Implementation Of Tasks And Facilities For Small Retention And Counteracting Water Erosion (Appendix No. 10). Obtaining A Set Of Legally Required Designs, Opinions, Decisions And Arrangements Necessary To Obtain A Final And Valid Decision On A Building Permit In Accordance With The Construction Law Act Of July 7, 1994 (Journal Of Laws Of 2024). Item 725) (Acting On Behalf Of The Employer) Projects Must Be Consistent With The Content Of The Project Implementation Manual (Annex No. 10 To Swz). The Designed Technical Solutions Must Guarantee No Negative Impact On Achieving Good Water Status And Not Deterioration Of Water Status. The Ordering Party Recommends That The Contractor, When Selecting Design Solutions, Use The Project Implementation Manual - Guidelines For The Implementation Of Tasks And Facilities For Small Retention And Counteracting Water Erosion, Together With The Above-Mentioned Annex. Manual, Constituting Appendix No. 10 Of The Swz. The Use Of Design Solutions Consistent With The Manual Is A Condition For The Ordering Partys Acceptance Of Chapter
Key Value
Tender Value
85,000 - PLN
Tender Documents
Global Tender Document
1a2de316-9489-4ece-ab80-62a0189f79c5.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.