K486a: Installation Of A 39.624M O/O X 4.876M Wide Steel Girder / Composite Deck, L-100 C/W Painted Hss Guardrails & Bolted Field Splice. A 21.3M Asp Is Secured For This Install And It Will Be Required To Be Picked Up At The Knutsford Forestry Yard By The Contractor. See Appendix K486a For Site Photos.K626: This Project Consists Of The Development, And Installation Of Rip Rap As Per The K626 Spius South Design. Along With Replacing Two Timber Guard Rails On The Bridge. It Will Also Require The Contractor To Remove The Current Composite Deck Panels On The Bridge To Gain Access To The Working Area And Replace Those Old Panels With New Composite Deck Panels (Expected You Will Need To Remove 2-3 Panels In Total). The Contractor Will Also Be Placing New Approach Barriers, Supplied By The Ministry. This Work Will Also Involve Placing And Packing Fill Over An Existing Fix Which Was Completed To The Compromised Footing. See Appendix K626 For Site Photossee Schedule C - Project Specifications, For Additional Details
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.