geotechnical Consultant For Independent Quality Assurance. Two Zoning Investigations Quick Renters Alta . Description The Assignment Involves Independent Quality Assurance Of The Reports Described In The Attached Assignment Description. The Acquisition Of The Studies Of The Quick Clay Zones And The Execution Of Foundation Borings Have Been Announced At The Same Time As This Assignment. The Client Will Award The Procurement Of Independent Quality Assurance At The Same Time As Awarding The Investigation And Foundation Drilling For The Two Quick Clay Zones. It Is Possible To Submit Offers For Both Assignments, But The Municipality Cannot Award Both Assignments To The Same Geotechnical Company, As Quality Assurance Must Be Independent. Quality Assurance Must Be Carried Out According To A Step-By-Step Methodology Cf. Fig 4.11 In Chapter 4.9 Of Nve Guide 1/2019. After The Award, Alta Municipality Will Invite To A Start-Up Meeting With Both The Municipality, Nve, Investigator And Quality Assurance. The Investigation Consultant Sets Up A Timetable For When The Various Phases Of The Project Are To Be Quality Assured. Participation In Meetings With The Investigator And The Municipality Must Be Expected. Independent Quality Assurance Must Be Documented, Preferably In A Control Note That Is Built Up Through The Various Phases Of Quality Assurance. The Final Report From The Carried Out Quality Assurance Must Follow The Registration Of The Changes In The Zone That The Assessment Consultant Enters Into Nves Digital Registration Solution. See Attached Assignment Description.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.