Tenders Are Invited For Construction Of 1 Concrete Road, 0.498 Km Long, 05 M Wide, 0.15 M Thick, Using 8 Mm Steel Cross-Section, With All Bands Where The Steel Cross And Fill The Red Soil, 0.5 M Wide, Both Sides Should Be Watered And Compacted By Elephant Legs Or Soil Compactors. - The Second Foundation Layer Must Be Filled With Crushed Stone (Mixed Stone) 0.15 Meters Thick. - Concrete Work Can Use Ready-Mixed Concrete Or Concrete Mixed By Truck. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And 0.4 M Apart - Do Not Push Carts Or Rollers Or Concrete Mixers Over The Horizontal And Vertical Rails - Recipients Should Be Covered With Concrete With A Filter Bag Or Filter Cloth And Watered For At Least 7 To 10 Days After Removing The Mold.
Tenders Are Invited For Construction Of 1 Concrete Road, 0.498 Km Long, 05 M Wide, 0.15 M Thick, Using 8 Mm Steel Cross-Section, With All Bands Where The Steel Cross And Fill The Red Soil, 0.5 M Wide, Both Sides Should Be Watered And Compacted By Elephant Legs Or Soil Compactors. - The Second Foundation Layer Must Be Filled With Crushed Stone (Mixed Stone) 0.15 Meters Thick. - Concrete Work Can Use Ready-Mixed Concrete Or Concrete Mixed By Truck. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And 0.4 M Apart - Do Not Push Carts Or Rollers Or Concrete Mixers Over The Horizontal And Vertical Rails - Recipients Should Be Covered With Concrete With A Filter Bag Or Filter Cloth And Watered For At Least 7 To 10 Days After Removing The Mold.
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
23-04-2026
Work Detail
Construction of 1 concrete road, 0.498 km long, 05 m wide, 0.15 m thick, using 8 mm steel cross-section, with all bands where the steel cross and fill the red soil, 0.5 m wide, both sides should be watered and compacted by elephant legs or soil compactors. - The second foundation layer must be filled with crushed stone (mixed stone) 0.15 meters thick. - Concrete work can use ready-mixed concrete or concrete mixed by truck. 0.5 m long and 19 mm PVC pipe. 0.5 m long and 0.4 m apart - Do not push carts or rollers or concrete mixers over the horizontal and vertical rails - Recipients should be covered with concrete with a filter bag or filter cloth and watered for at least 7 to 10 days after removing the mold.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.