Tenders Are Invited For Construction Of 1 Main Concrete Road, 0.440 Km Long, 6 M Wide, 0.2 M Thick Concrete, Using 10 Mm Steel Cross Section. And Fill The Red Soil, Shoulder Width 0.3 M, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.10 M Thick - The Second Foundation Layer Should Be Filled With Crushed Stone (Concrete) Thickness 0.15 M - Concrete Work Can Be Mixed Concrete Or Concrete - 4 Wheels Should Be Installed To Protect The Road. - Concrete Road Work Must Be Tied With A Width Of 0.0 Meters And The Correct Pile Must Be Placed At A Height Of 0.075 Meters. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Removing The Molded Panel. Power 6
Tenders Are Invited For Construction Of 1 Main Concrete Road, 0.440 Km Long, 6 M Wide, 0.2 M Thick Concrete, Using 10 Mm Steel Cross Section. And Fill The Red Soil, Shoulder Width 0.3 M, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.10 M Thick - The Second Foundation Layer Should Be Filled With Crushed Stone (Concrete) Thickness 0.15 M - Concrete Work Can Be Mixed Concrete Or Concrete - 4 Wheels Should Be Installed To Protect The Road. - Concrete Road Work Must Be Tied With A Width Of 0.0 Meters And The Correct Pile Must Be Placed At A Height Of 0.075 Meters. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Removing The Molded Panel. Power 6
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
23-04-2026
Work Detail
Construction of 1 main concrete road, 0.440 km long, 6 m wide, 0.2 m thick concrete, using 10 mm steel cross section. And fill the red soil, shoulder width 0.3 m, be watered and compacted by elephant foot or soil compactor - The floor should be paved with clear plastic rubber - The first foundation layer should be filled with red gravel 0.10 m thick - The second foundation layer should be filled with crushed stone (concrete) thickness 0.15 m - Concrete work can be mixed concrete or concrete - 4 wheels should be installed to protect the road. - Concrete road work must be tied with a width of 0.0 meters and the correct pile must be placed at a height of 0.075 meters. 0.5 m long and 19 mm PVC pipe. 0.5 m long and 0.40 m apart - Do not push the cart or drive a concrete mixer truck over the horizontal and vertical ropes - The recipient must cover the concrete with a sack or filter cloth and water for at least 7 to 10 days after removing the molded panel. Power 65W Full battery 50Ah (50000mAh) Solar panel size 630mmx590mmx20mm (Mono panel type) Bulb size 450mmx210mm Bulb 128lm / W Brightness 12-18h-base M16x450mmx600mm pole 5.5m Base size (90mmx2m) Center (75mmx2m) pole (60mmx1m) bottom (60mmx1m) end (60mmx1m) 200mmx200mmx8mm)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.