Tenders Are Invited For Urban Environmental Development Planning - Győr Suburban Transport Development Planning

Tender Detail

111500799
239898-2026
Self-Funded
Tenders Are Invited For Urban Environmental Development Planning - Győr Suburban Transport Development Planning
NCB
central europe
European Union
07-05-2026

Work Detail

Urban Environmental Development Planning - Győr Suburban Transport Development Planning. Types Of Plans To Be Prepared: • Technical Preliminary Inspection And Preliminary Inspection Documentation: The Task Is To Investigate The Installation Of Elevators By Exploring The Current Condition Of The Underpasses And To Examine The Underpass And Technical Solution Designated For Further Planning, Selecting The Most Suitable Version According To The Appropriate Methodology; • Preparation Of Licensing Plans; • Obtaining Necessary Operator Approvals; • Necessary And Obtainable Official Establishment Permits At The Authorization Plan Level; • Conducting An Environmental Protection Official Procedure; • Preparation Of Construction Plans And Tender Documentation (Volume 3-4. 5); • Preparation Of Construction Plans For Railway Track (As Part Of Tender Documentation); Tasks To Be Performed As Part Of Planning: • Geodetic Survey: • Geotechnical Investigation: • Public Utility Plan, Public Utility Planning: Construction Plans Must Be Prepared For The Railway Track. • Traffic Planning: • Architectural Design: • Street Lighting: • Environmental Protection: • Organizational Plan: • Other Necessary Planning And Expert Tasks: The Cost-Benefit Analysis Prepared As Part Of The Feasibility Study Establishing The Planning Task Must Be Reviewed Based On The Technical Content Specified During The Planning, According To The Relevant Guidelines Of The Integrated Transport Development Operational Program Plus. The Consents Of The Relevant Operators Must Be Obtained For The Authorization Plans. Before The Official Approval, It Is Necessary To Cooperate In Obtaining The Intermediate Conformity Assessment Statement By An Independent Certification Organization. It Is Also The Responsibility Of The Winning Bidder To Review The Cost-Benefit Analysis Prepared As Part Of The Feasibility Study Establishing The Design Task, Based On The Technical Content Specified During The Design, According To The Relevant Guidelines Of The Integrated Transport Development Operative Program Plus. The Length Of The Platforms Affected By The Design Is More Than 400 M Each, And Their Width Exceeds 5 M.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document ac99ff36-bd63-4e87-a539-a66df20863f5.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail