Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
14-04-2026
Work Detail
Quotation are invited for Complete Overhauling & Coating of NRV DN500 PN10 (Ozkan) for Nad Al Sheaba Pumping Station 1032601456 1 ITEM-00001 COMPLETE OVERHAULING & COATING OF NRV DN500 PN10 (OZKAN) FORNAD AL SHEABA PUMPING STATIONPLEASE CONTACT MR. NOOR (052-9172523) FOR FURTHER CLARIFICATION.1.0#SCOPE OF WORKTHE HYDRAULIC DAMPERS OF NRV (NON RETURN VALVE/CHECK VALVE) ARE NOTWORKING PROPERLY FOR WHICH DEWA INTENDED TO OUTSOURCE THE REPAIRING &COATING JOB IN LOCAL REPUTED CONTRACTOR.#DETAILS OF THE NRV:·#MAKE: ###OZKAN·#NOMINAL DIA METER: #DN500·#PRESSURE RATING:#PN10#SCOPE OF WORKSA.#REPAIRING/OVERHAULING/COATING OF COMPLETE VALVEC.#REPLACEMENT OF SEALING RING & BUSH, IF INDEED REQUIRES.D.#TRUENESS CHECK OF DRIVE SHAFT & SHORT SHAFT, IF REQUIRES REPAIRINGOF THE SHAFTSE.#WITH STANDARD DESIGN , THE DAMPING TIME MUST BE SET SO THAT THE BACKPRESSURE SLAM SHOULD BE REDUCED.F. 1 SET HYDRAULIC DAMPER REPAIRING & REPLACEMENT OF REQUIR ED SPARES2.0#PRIOR TO SUBMISSION OF QUOTATION, THE FOLLOWING SHALL BE DETERMINEDCAREFULLY:A.#THE CONTRACTOR SHALL VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIARWITH THE WORK SCOPES, COMPLEXITIES, ETC., BEFORE SUBMITTING THEQUOTATION.B.#DEWA WILL NOT ACCEPT ANY CLA IM FOR EXTRAS BEYOND THE ORDER RATES /PRICES DURING AND AFTER THE EXECUTION OF WORK ORDERED.C.# THE CONTRACTOR SHOULD SUBMIT THE TIM E SCHEDULE /BAR CHARTINDICATING EACH ACTIVITY.D.#ON COMPLETION OF THE WORK, THE INSPECTION CHECKLIST OF QUALITYPROCEDURES, WHEREVER APPLICABLE SHOULD BE FILLED IN AND SUBMITTED.3. INTERNAL & EXTERNAL COATING OF NON RETURN VALVE4.0#TAKE OVERON COMPLETION OF ALL WOR K WITHIN THE SCOPE OF THE CONTRACT, FORACCEPTANCE OF THE MAINTENANCE WORK, CONTRACTOR SHALL NOTIFY DEWA INWRITING. A CERTIFICATE OF COMPLETION WILL BE ISSUED BY DEWA ON FINALINSPECTION ONLY WHEN THE CONTRACT WORK IS DEEMED TO HAVE BEEN TAKEN OVERBY DEWA AFTER NECE SSARY CONDITION MONITORING CHECKS WHEREVER & WHENEVERREQUIRED.5.0#WARRANTYA.#ALL THE WORK CARRIED OUT SHALL CARRY A WARRANTY FOR 800 0 HOURS OFOPERATION OR 1 YEAR WHICHEVER IS EARLIER. SPECIAL NOTES / INSTRUCTIONS: Complete Overhauling & Coating of NRV DN500 PN10 (OZKAN) for NAD AL SHEABA Pumping station STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332600826)/$value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.