A Tender Has Been Announced For The Reconstruction Of The 10 Kv Switchgear Of Tsirguliina 330/110/10 Kv Substation (Ik1099).Nb! The Contractor Will Organize An Inspection Of The Object On 16.04.2026, More Detailed Information In The Documents. Build A New Js Building With A Control Room, Install The Delivered 10 Kv Switchgear. Install The Supplied Mot And Kkp. Tie The 10 Kv Network, Tie And Install Secondary Equipment Until The Entire Substation Is Put Into Operation. Build An Access Road, Connect The Existing Equipment To The Switchgear. Dismantle The Old Er Control Building And The Old 6 Kv External Switchboard With Unnecessary Facilities. The Deadline For The Execution And Handover Of The Works Is 328 Days From The Signing Of The Contract. If Possible And Necessary, The Contract Can Be Concluded And The Execution Of Works/Ordering Of Services Can Begin Before The Expected Start Date Of The Validity Of The Contract Published In The General Data On The Procurement. If The Course Of The Procurement Procedure Is Prolonged Beyond This Time, The Contract May Be Concluded And Its Execution May Begin Even After The Expected Start Date Of The Validity Of The Contract Published In The General Data.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.