Tenders Are Invited For Construction Work For Pipelines, Communication And Power Lines, For Highways, Roads, Airfields And Railways; Flatwork – Stettlen, Hangsicherung Ferenbergstrasse
Tenders Are Invited For Construction Work For Pipelines, Communication And Power Lines, For Highways, Roads, Airfields And Railways; Flatwork – Stettlen, Hangsicherung Ferenbergstrasse
Construction Work For Pipelines, Communication And Power Lines, For Highways, Roads, Airfields And Railways; Flatwork – Stettlen, Hangsicherung Ferenbergstrasse. Ferenbergstrasse Will Be Closed For The Entire Duration Of The Construction Site. The Entrepreneur Is Therefore Able To Use The Street Area As A Storage Area. A Diversion From Stettlen Via Bolligen To Ferenberg Will Be Signaled. Access To Ferenbergstrasse 57 From The Direction Of Stettlen Must Be Guaranteed At All Times. In Addition, Access To The Houses At Ferenbergstrasse 83 And 85 As Well As Wolfenstall 8, 9 And 11 Must Be Guaranteed At All Times, Either From The Direction Of Bolligen Or Stettlen. The Exception Is Possible Paving Installations. This Will Be Clarified With The Residents During Construction. In Addition, The Crossing Of The Hiking Trail From Etterholzweg Into The Forest Must Be Guaranteed. All Construction Projects Up To And Including The Creation Of The Base Course In The Municipality Of Stettlen Must Be Completed By The End Of November 2026. This Includes The Slope Stabilization Measures Using Concrete Bars And Shoulder Fixation, The Creation Of The New Sewer Connection, The New Foundation Layer, The Curbs And The Base Layer. Ferenbergstrasse Will Then Be Reopened To Traffic. All Work In The Municipality Of Bolligen And The Decking Work In The Municipality Of Stettlen Will Be Completed From April 2027.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.