Checking The Condition Of The Lightning Arrester And Measuring Its Resistance., Checking The Lightning Cap., Checking The Continuity Of Conductive Wires., Checking The Connection Shackles And Cross-Sectional Diameter Of The Landing Wire., Protection Tube Inspection., Checking The Lightning Meter., Checking The Level Of Corrosion Of Earth Rods, Rod Heads And Underground Conductors., Inspection Of Underground Conductors., Measurement Of Grounding With A Special Device., Inspection Of Solar Lamps, Checking The Condition Of Cold Galvanizing (Painting) Of The Support Pole Element Of The Lightning Protection Device, Checking The State Of The Contours Of Grounding In Lightning And Static Electricity Protection Devices
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.