Tenders Are Invited For Hire Of Industrial Vehicles With Driver - Rental Services Of Machines For Recycling With Variable Pre-Compaction Beam Between 2-3.5 M, Minimum Drum Width 2.2M And Recycling Thickness Between 10-25 Cm For The Production Department - Agreement - Frame 2 Years
Tenders Are Invited For Hire Of Industrial Vehicles With Driver - Rental Services Of Machines For Recycling With Variable Pre-Compaction Beam Between 2-3.5 M, Minimum Drum Width 2.2M And Recycling Thickness Between 10-25 Cm For The Production Department - Agreement - Frame 2 Years
Hire Of Industrial Vehicles With Driver - Rental Services Of Machines For Recycling With Variable Pre-Compaction Beam Between 2-3.5 M, Minimum Drum Width 2.2M And Recycling Thickness Between 10-25 Cm For The Production Department - Agreement - Frame 2 Years. It Is Desired To Purchase Recycling Equipment Rental Services With Variable Pre-Compactor Beam Between 2-3.5 M, Minimum Drum Width 2.2 M And Recycling Thickness Between 10-25 Cm For The Production Department - Agreement - Frame 2 Years Estimated Value Of The Framework Agreement: - Estimated Minimum Value: 186,000.00 Lei Without Vat - Estimated Maximum Value: 9,997,500.00 Lei Without Vat - Estimated Value Of The Smallest Subsequent Contract: 93,000.00 Lei Without Vat - Estimated Value Of The Largest Subsequent Contract: 2,325,000.00 Lei Without Vat Frequency And Value Of Subsequent Contracts To Be Awarded: Minimum 1 - Maximum 3 - Subsequent Contracts Will Be Concluded/Year. The Minimum And Maximum Quantities Related To The Framework Agreement Can Be Found As Annexes To The Award Documentation / Specifications. 1. Total Duration Of The Contract: 24 Months From The Entry Into Force Of The Contract 2. At The Current Date At The Drdp Cluj Level, The Duration Of Framework Agreement No. 24/6005/12.03.2024 Expired (12.03.2026), Based On This Framework Agreement, A Last Subsequent Contract No. 24/6005/4/10.03.2026 With Validity Until 31.12.2026. In Order To Ensure The Continuity Of The Rental Services For These Types Of Machines, The Present Acquisition Is Started, So That The Subsequent Contracts That Will Be Concluded Based On The New Framework Agreement Will Be Concluded Only After The Subsequent Contract No. 24/6005/4/10.03.2026 In Force Ceased Either By Reaching The Deadline Or At The Time When All The Obligations Set For The Parties Were Executed.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.