Construction Work For Bridges – Nydegg Bridge, Overall Renovation Of Nydegg Bridge, Master Builder Work. Construction Work, Total Renovation Of The Nydegg Bridge: - Scaffolding Work And Construction Of A Temporary Pedestrian Passerelle Next To The Nydegg Bridge, On The Upstream Side - Construction Of Temporary Stops - Construction Of Smaller Scaffolding Stairs/Ramps For Pedestrians For Temporary Pedestrian Tours - Dismantling Of Paving Incl. Preparation Of Paving Stones For Reuse On The Street - Dismantling Of... Curbs For Civil Engineering Works In The City Of Bern - Demolition And Disposal Of Curbs That Cannot Be Reused - Replacement Of Sealing Of Street Areas And Sidewalks Using Uhfb Layer - New Construction Of Paving - Widening Of Sidewalk Areas And Replacement Of Mastic Asphalt - Replacement And New Construction Of Sewerage, Drainage And Works Pipes - Construction Of 4 New Obstacle-Free Stops - New Construction Of Bärengraben Roundabout In Asphalt - New Construction Of Stairs And Ramps For Access To Klösterlistutz -New Construction Of Tree Pits Including Construction System For Water Level Control In The Foreland Area Of Nydegg (City Side) -Joint Renovation Of Parapet Elements Most Important Quantities: -Demolition Of Concrete Slab: 2000 M2 -Asphalt Breaking Up / Milling: 4500 M2 -Dismantling And Preparation Of Paving: 3500 M2 -Excavation: 4200 M3 (Solid) -Plastic Pipes: 10200 M -Steel Construction: 25 T -Scaffolding: 1200 M2 -Scaffolding Towers: 1500 M3 -Prov. Pedestrian Walkway: 200 M -In-Situ Concrete: 1000 M3 -Uhfb: 100 M3 -Formwork: 3800 M2 -Reinforcement: 130 T -Sealing: 1800 M2 -Drilling And Cutting: 900 M And 300 M2 -Nail Walls: 50 M2 -Filling And Foundation Layer: 9300 M3 (Loose) -Plane: 5300 M2 -Rolled Asphalt: 2100 M2 -Mastic Asphalt: 1580 M2 -Paving: 3600 M2
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.