Tenders Are Invited For Construction Of 1 Main Concrete Road, 0.495 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil, Shoulder Width 0.3 M, Be Watered And Compressed By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.10 M Thick - The Second Foundation Layer Should Be Filled With Crushed Stone (Concrete) Thickness 0.0 M - Concrete Work Can Be Used Mixed Concrete Or Concrete 0.4M, Height 2M, 2 Trees, 1 Place - 1 Project Sign Must Be Posted - Concrete Road Paving Work Must Be Fastened With A Width Of 0.20 Meters And The Correct Deposit Must Be Placed At A Height Of 0.75 Meters. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To
Tenders Are Invited For Construction Of 1 Main Concrete Road, 0.495 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil, Shoulder Width 0.3 M, Be Watered And Compressed By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.10 M Thick - The Second Foundation Layer Should Be Filled With Crushed Stone (Concrete) Thickness 0.0 M - Concrete Work Can Be Used Mixed Concrete Or Concrete 0.4M, Height 2M, 2 Trees, 1 Place - 1 Project Sign Must Be Posted - Concrete Road Paving Work Must Be Fastened With A Width Of 0.20 Meters And The Correct Deposit Must Be Placed At A Height Of 0.75 Meters. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
21-04-2026
Work Detail
Construction of 1 main concrete road, 0.495 km long, 5 m wide, 0.15 m thick concrete, using 8 mm steel cross section. And fill the red soil, shoulder width 0.3 m, be watered and compressed by elephant foot or soil compactor - The floor should be paved with clear plastic rubber - The first foundation layer should be filled with red gravel 0.10 m thick - The second foundation layer should be filled with crushed stone (concrete) thickness 0.0 m - Concrete work can be used mixed concrete or concrete 0.4m, height 2m, 2 trees, 1 place - 1 project sign must be posted - Concrete road paving work must be fastened with a width of 0.20 meters and the correct deposit must be placed at a height of 0.75 meters. 0.5 m long and 19 mm PVC pipe. 0.5 m long and shall be spaced 0.40 m apart - Do not push the cart or drive a concrete mixer truck over the horizontal and vertical ropes - The recipient must cover the concrete with a sack or filter cloth and water for at least 7 to 10 days after removing the mold.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.