Tenders Are Invited For Construction Of 1 Concrete Road, Length 0.517 Km, Width 05 M, Concrete Thickness 0.15 M, Use Steel, Cross Section 8 Mm, Steel, All Joints Where The Steel Cross And Fill The Red Soil, The Shoulder Width Of 0.5 M, Both Sides Should Be Watered And Compacted With An Elephant Foot Or Soil Compactor And A Drainage Channel In One Place. Using 0.10 M Thick Red Gravel - Fill The Second Layer Of Foundation With Crushed Stone (Concrete) 0.15 M Thick - Concrete Pouring Can Use Ready-Mixed Concrete Or Concrete Mixed By Truck - Must Have A Project Label 1 - Steel Wire Work Must Be 0.20 Meters Wide And The Correct Deposit Has A Height Of 0.75 Meters - 14 Meters Wide Extension. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And 0.4 M Apart - Do Not Push Carts Or Rollers Or Concrete Mixers Over The Horizontal And Vertical Rails - Recipients Should Be Covered With Concrete With A Filter Bag Or Filter Cloth And Watered For At Least 7 To 10 Days After Removing The Mold.
Tenders Are Invited For Construction Of 1 Concrete Road, Length 0.517 Km, Width 05 M, Concrete Thickness 0.15 M, Use Steel, Cross Section 8 Mm, Steel, All Joints Where The Steel Cross And Fill The Red Soil, The Shoulder Width Of 0.5 M, Both Sides Should Be Watered And Compacted With An Elephant Foot Or Soil Compactor And A Drainage Channel In One Place. Using 0.10 M Thick Red Gravel - Fill The Second Layer Of Foundation With Crushed Stone (Concrete) 0.15 M Thick - Concrete Pouring Can Use Ready-Mixed Concrete Or Concrete Mixed By Truck - Must Have A Project Label 1 - Steel Wire Work Must Be 0.20 Meters Wide And The Correct Deposit Has A Height Of 0.75 Meters - 14 Meters Wide Extension. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And 0.4 M Apart - Do Not Push Carts Or Rollers Or Concrete Mixers Over The Horizontal And Vertical Rails - Recipients Should Be Covered With Concrete With A Filter Bag Or Filter Cloth And Watered For At Least 7 To 10 Days After Removing The Mold.
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
20-04-2026
Work Detail
Construction of 1 concrete road, length 0.517 km, width 05 m, concrete thickness 0.15 m, use steel, cross section 8 mm, steel, all joints where the steel cross and fill the red soil, the shoulder width of 0.5 m, both sides should be watered and compacted with an elephant foot or soil compactor and a drainage channel in one place. Using 0.10 m thick red gravel - Fill the second layer of foundation with crushed stone (concrete) 0.15 m thick - Concrete pouring can use ready-mixed concrete or concrete mixed by truck - Must have a project label 1 - Steel wire work must be 0.20 meters wide and the correct deposit has a height of 0.75 meters - 14 meters wide extension. 0.5 m long and 19 mm PVC pipe. 0.5 m long and 0.4 m apart - Do not push carts or rollers or concrete mixers over the horizontal and vertical rails - Recipients should be covered with concrete with a filter bag or filter cloth and watered for at least 7 to 10 days after removing the mold.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.