Tenders Are Invited For Construction Of 2 Concrete Roads, 0.568 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil Shoulder Width Of 0.3 M Wide, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.10 M Thick - The Second Foundation Layer Should Be Filled With Crushed Stone (Concrete) Thickness 0.15 M - Concrete Pouring Can Use Concrete Mix 6 Meters Long, 1 Place - 4 Road Protection Drains Must Be Installed - Concrete Paving Work Must Be Tied With A Width Of 0.20 Meters And The Foundation Must Be Installed Correctly, Height 0.75 Meters - 20 Meters Of Joint Expansion Work Must Be Used With 14 Mm Cane Bars. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With

Tender Detail

111388579
Self-Funded
Tenders Are Invited For Construction Of 2 Concrete Roads, 0.568 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil Shoulder Width Of 0.3 M Wide, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.10 M Thick - The Second Foundation Layer Should Be Filled With Crushed Stone (Concrete) Thickness 0.15 M - Concrete Pouring Can Use Concrete Mix 6 Meters Long, 1 Place - 4 Road Protection Drains Must Be Installed - Concrete Paving Work Must Be Tied With A Width Of 0.20 Meters And The Foundation Must Be Installed Correctly, Height 0.75 Meters - 20 Meters Of Joint Expansion Work Must Be Used With 14 Mm Cane Bars. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With
NCB
South-Eastern Asia
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
20-04-2026

Work Detail

Construction of 2 concrete roads, 0.568 km long, 5 m wide, 0.15 m thick concrete, using 8 mm steel cross section. And fill the red soil shoulder width of 0.3 m wide, be watered and compacted by elephant foot or soil compactor - The floor should be paved with clear plastic rubber - The first foundation layer should be filled with red gravel 0.10 m thick - The second foundation layer should be filled with crushed stone (concrete) thickness 0.15 m - Concrete pouring can use concrete mix 6 meters long, 1 place - 4 road protection drains must be installed - Concrete paving work must be tied with a width of 0.20 meters and the foundation must be installed correctly, height 0.75 meters - 20 meters of joint expansion work must be used with 14 mm cane bars. 0.5 m long and 19 mm PVC pipe. 0.5 m long and shall be spaced 0.40 m apart - Do not push the cart or drive a concrete mixer truck over the horizontal and vertical ropes - The recipient must cover the concrete with a sack or filter cloth and water for at least 7 to 10 days after removing the mold.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 2c30dd6a-e8ba-4762-9f0f-5e9cf9634468.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail

WhatsApp