Tenders Are Invited For Construction Of 1 Reinforced Concrete Road, 0.473 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil, Shoulder Width 0.3 M, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.10 M Thick - The Second Foundation Layer Should Be Filled With Crushed Stone (Concrete) Thickness 0.15 M - Concrete Work Can Be Mixed Concrete Or Concrete 4 Wheel Gutters Shall Be Installed To Prevent The Road From Being Paved With Concrete, The Width Of The Concrete Road Shall Be 0.20 Meters Wide And The Pile Shall Be Properly Installed At A Height Of 0.75 Meters. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days
Tenders Are Invited For Construction Of 1 Reinforced Concrete Road, 0.473 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil, Shoulder Width 0.3 M, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.10 M Thick - The Second Foundation Layer Should Be Filled With Crushed Stone (Concrete) Thickness 0.15 M - Concrete Work Can Be Mixed Concrete Or Concrete 4 Wheel Gutters Shall Be Installed To Prevent The Road From Being Paved With Concrete, The Width Of The Concrete Road Shall Be 0.20 Meters Wide And The Pile Shall Be Properly Installed At A Height Of 0.75 Meters. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
20-04-2026
Work Detail
Construction of 1 reinforced concrete road, 0.473 km long, 5 m wide, 0.15 m thick concrete, using 8 mm steel cross section. And fill the red soil, shoulder width 0.3 m, be watered and compacted by elephant foot or soil compactor - The floor should be paved with clear plastic rubber - The first foundation layer should be filled with red gravel 0.10 m thick - The second foundation layer should be filled with crushed stone (concrete) thickness 0.15 m - Concrete work can be mixed concrete or concrete 4 wheel gutters shall be installed to prevent the road from being paved with concrete, the width of the concrete road shall be 0.20 meters wide and the pile shall be properly installed at a height of 0.75 meters. 0.5 m long and 19 mm PVC pipe. 0.5 m long and 0.40 m apart - Do not push the cart or drive a concrete mixer truck over the horizontal and vertical ropes - The recipient must cover the concrete with a sack or filter cloth and water for at least 7 to 10 days after removing the molded panel. Power 65W Full battery 50Ah (50000mAh) Solar panel size 630mmx590mmx20mm (Mono panel type) Bulb size 450mmx210mm Bulb 128lm / W Brightness 12-18h-base M16x450mmx600mm pole 5.5m Base size (90mmx2m) Center (75mmx2m) pole (60mmx1m) bottom (60mmx1m) end (60mmx1m) 200mmx200mmx8mm)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.