GTR 111374910
Tenders Are Invited For Engineering Design Services - Preparation Of Design Documentation For The Task Entitled: Reconstruction Of The Dębki Ii Pump Station In The Commune. Krokowa, Poviat Pucki
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
111374910
Tendering Authority
Subscribe to view
Tender No
231424-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Engineering Design Services - Preparation Of Design Documentation For The Task Entitled: Reconstruction Of The Dębki Ii Pump Station In The Commune. Krokowa, Poviat Pucki
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
08-05-2026
Closed
Work Detail
Engineering Design Services - Preparation Of Design Documentation For The Task Entitled: Reconstruction Of The Dębki Ii Pump Station In The Commune. Krokowa, Poviat Pucki. 1 The Subject Of The Order Is The Service Titled: Preparation Of Design Documentation For The Task Titled: Reconstruction Of The Dębki Ii Pump Station In The Commune. Krokowa, Poviat Pucki. 1.1 The Subject Of The Basic Order (Hereinafter Referred To As The Basic Order Or Basic Task) Is The Service Consisting In The Development Of Design Documentation Along With Obtaining All Necessary Opinions/Approvals/Permits/Decisions Enabling The Performance Of Investor Supervision And The Ordering Of Construction Works For The Task Entitled: Reconstruction Of The Dębki Ii Pump Station In The Commune. Krokowa, Poviat Pucki. As Part Of The Study, All Consents And Permits Necessary To Implement The Investment Consisting In The Construction Of A New Pump Station Must Be Obtained. It Is Assumed That Flood Protection Must Be Provided Throughout The Duration Of The Works. Other Methods Of Solving The Problem Of Pumping Water During The Investment Are Allowed, Proposed By The Contractor And Approved By The Ordering Party. The Aim Of The Investment Is To Improve Flood Protection In The Wierzchucińskie Błota Polder With An Area Of 1,209 Ha. The Administrative Process Should Be Conducted In Accordance With The Act Of July 8, 2010 On Specific Rules For Preparing Investments In The Field Of Flood Protection Structures (Consolidated Text: Journal Of Laws Of 2026, Item 104, As Amended). The Task Will Include Construction Of A New Drainage Pumping Station In Place Of The Old Drainage Pumping Station, Construction Of A Single-Story Technical Building With The Necessary Infrastructure And Equipment, And Development Of The Pump Station Plot. The Implementation Of The Basic Order Is Divided Into The Following Stages: Stage I, Stage Ii, Stage Iii, Described In The Description Of The Subject Of The Order, Constituting Annex No. 1 To The Swz. 1.2 The Ordering Party Provides For The Possibility Of Exercising Options In This Order. The Subject Of The Contract Under The Option Right Are The Following Services: Option I: Environmental Impact Report (Eis) (If The Authority Imposes An Obligation To Prepare The Report). Option Ii: Performing Authors Supervision Over Works Performed On The Basis Of The Developed Design Documentation As Part Of The Order, Which Will Be Performed From The Date Indicated In The Notification Of The Commencement Of Construction To The Day Indicated As The Day Of Completion Of Construction In The Notification Of Completion Of Construction. Note: A. The Ordering Party Envisages The Application Of The Option Right Pursuant To Art. 441 Of The Public Procurement Law. The Condition For Triggering The Option Right Is The Ordering Partys Declaration Of Will To Perform The Order Under The Option Right, Submitted To The Contractor In Writing; B. The Ordering Party May Resign From Performing All Or Part Of The Order Covered By The Option Right; C. The Exercise Of The Option Right Is Not Obligatory. If The Ordering Party Does Not Exercise The Option Right, The Contractor Shall Not Be Entitled To Any Claims In This Respect. A Detailed Description Of The Subject Of The Contract And The Terms Of Execution Of The Contract Are Specified In: - Description Of The Subject Of The Contract (Opz) - Annex No. 1 To The Swz. - Draft Provisions Of The Contract (Ppu) – Annex No. 8 To The Swz. 2. Completion Date A
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
5f57f4ef-dfc8-4a7d-824b-1880e96c190d.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.