Laboratory Services – Tasks Supporting The Baf Monitoring System. During The Performance Of The Contractual Task, The Aim Is To Ensure The Implementation Of The Hydrogeological Monitoring Test Program Related To The Research Of The Boda Clay Stone Formation (Baf), Built And Operated For The Long-Term Monitoring Of The Geological Environment. The Task Is To Take Accredited Water Samples At The Monitoring Points Of The Research Area, Carry Out On-Site And Laboratory Tests, Organize The Measured And Derived Data Into A Database, Maintain And Renovate The Works Of Art, And Prepare Annual Operational Reports. The Numbering Of The Tasks Detailed Below Is The Same As The Task Codes According To Annex 1 (Technical Description) And Annex 2 (Details Of The Contractors Fee, Draft Performance And Invoicing Schedule) Of The Related Draft Contract. 1. Flat-Rate Portion Of The Contractors Fee, Direct Vat 1.1 Annual Operating Report 3 Reports 2. Itemized Portion Of The Contractors Fee (Planned Quantities) Straight Vat 2.1 Sampling 2.1.1 Water Sampling From Effluent Water 10 Samples 2.1.2 Water Sampling By Pumping 43 Samples 2.2 Laboratory Tests 2.2.1 General Water Chemistry From Water (21 Components) 53 Samples 2.2.2 Trace Element Testing From Water (31 Elements) 53 Samples 2.2.3 Determination Of O-18 And H-2 From Water 53 Samples 2.2.4 Determination Of H-3 From Water 12 Samples 2.2.5 Determination Of Tritium Using The H-3/He-3 Method From Water 12 Samples 2.2.6 Rn-222 Determination From Water 12 Samples 2.2.7 Determination Of Water Age, C-13 And C-14 From Water 12 Samples 2.2.8 Determination Of S-34 From Water 12 Samples 2.2.9 Determination Of N-15 From Water 12 Samples 2.2.10 Determination Of O-18 (From So4) From Water 12 Samples 2.2.11 Measurement Of Noble Gas Content And Isotope Ratio 12 Samples From Water 2.2.12 Determination Of U-234/238 12 Samples From Water 2.2.13. Determination Of Sr-87/86 From Water 12 Samples 2.2.14 Determination Of Kr-81 From Water, At Water 4 Samples 2.2.15 Determination Of Cl-36 From Water, At Water 4 Samples 2.3 Renovation, Maintenance (Frame Amount) 2.3.1 Renovation, Maintenance 3. Optional Part 3.1 30% Of The Amount Specified For All Measurements/Tasks Indicated, With The The Consideration Of The Option May Not Exceed 5% Of The Contractual Amount (Net Contractors Fee). Annex (Technical Description). 1.1. The Report And Tasks Listed In Point 297/2009 (Xii. 21.) Can Only Be Carried Out By The Water Management Expert Szvv 3.10. With Authorization, Or Construction Technical Expert Szém According To Government Decree 266/2013 (Vii. 21.) 3.3.4. Can Be Carried Out Under The Supervision/Countersignature Of An Authorized Expert. 2.1. The Entire Field Activity According To Point Can Be Carried Out Under The Planning/Supervision/Coordination Of The Above Expert. 2.2. Laboratory Tests According To Point Can Only Be Performed In A Laboratory With The Required Accreditation And Appropriate References.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.