The Subject Of The Order Is: 1) Preparation Of Design Documentation In The Scope, Quantity And Form Indicated In The Contract Template, Together With Obtaining Construction Consents: Administrative Decisions, Certificates, Permits, Arrangements, Provisions, Conditions, Checks And Opinions Necessary For The Proper Execution Of The Design Documentation And Construction Works Carried Out On Its Basis, The Obligation To Obtain Which Results From The Applicable Regulations, 2) Carrying Out Authors Supervision, A) Execution Of Construction Works, Based On The Developed Design Documentation Together With Accompanying Works And Activities Necessary For Implementation Construction Works Described In The Contract Template, 3) Obtaining A Decision On The Occupancy Permit, Reporting The Completion Of Construction Works/Construction To The Construction Supervision Authority (If Necessary), 4) Preparing Complete As-Built Documentation. The Scope Of The Subject Of The Order Consists Of The Basic Performance And The Performance Covered By The Option Right, In Which: 1) The Basic Performance Includes: A) Design And Implementation Of: • Football Pitches With An Artificial Grass Surface, Including Ball Catches And A Drainage System And Equipment, • A Multi-Purpose Pitch With A Polyurethane Surface With Ball Catches, A Drainage System And Equipment, • A Building With Sanitary, Cloakroom And Utility Facilities, • Land Development And Fencing, • Lighting For The Pitches And The Area, • Grandstands For Spectators And Two Roofed Shelters For Players, • Technical Infrastructure, • Access Routes And Access Roads To The Sports Complex, • Acoustic Screens, • A Board Informing About The Implementation Of The Investment With The Support Of External Funds, Together With Accompanying Works And Activities Necessary To Carry Out The Construction Works Described In The Contract Template, 2) The Benefit Covered By The Option Right Includes: A) Execution Of: • Hardening Of A Section Of Ul. Ecologists, Along With Parking Spaces, Along With Accompanying Works And Activities Necessary To Carry Out The Construction Works Described In The Contract Template. The Description Of The Subject Of The Order (Taking Into Account The Scope Covered By The Option Law) States: 1. Functional And Utility Program With Attachments2. Contract Template With Annexes3. These Terms Of Reference. The Ordering Party Obtained A Decision To Remove The Trees Indicated In The Functional And Utility Program. 6 Common Beech Trees Were Designated As Replacement Plantings (Annex To The Ffu). The Ordering Party Informs That For The Implementation Of The Task Gliwice - City With County Rights, It Obtained Funding From The Ministry Of Infrastructure And Technology Under The Orlik Sports Complex Construction Program. 2025. The Ordering Party Informs That In 2026 Intends To Allocate A Maximum Amount Of Pln 2,000,000.00 Gross For The Implementation Of The Task. Note: The Scope Of The Task And The Description Of The Requirem
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.