133-Bym-2025 - Procurement Of A Contractor For The Construction Of New Operating Piers On Hovedøya . Descriptionsection The Islands In Bym Need The Replacement Of Operating Piers At The Operating Station In Hovedøybukta On Hovedøya. Todays Jetty Is An Older Wooden Jetty And A Floating Jetty In Two Parts, One Part In Concrete And One Part In Wood. These Two Piers Are To Be Replaced By Two New Floating Piers. Demolition Of The Wooden Pier Is Included In Another Contract. Configuration And Placement Have Been Drawn Up By Norconsult As In A Separate Report. The Report Also Contains A Description Of The Necessary Preparatory Work, Such As Blasting Of A Shallow And Dredging Of The Seabed. Cost Estimates And Both Preliminary Work And Delivery Of The Floating Docks Are Included.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.