Tenders Are Invited For Installation Of Automatic Rapid Monitoring Systems On Reservoirs As Part Of The Project Increasing The Level Of Adaptability And Resistance To The Negative Effects Of Climate Change In The City Of Chojnice
Tenders Are Invited For Installation Of Automatic Rapid Monitoring Systems On Reservoirs As Part Of The Project Increasing The Level Of Adaptability And Resistance To The Negative Effects Of Climate Change In The City Of Chojnice
The Scope Of The Project Includes: Fatima Reservoir: • Earthworks, • Construction Of A Pre-Meter Cable Connection Using The Linear Excavation Method, • Construction Of A Surface Made Of Road Slabs And A Strip Of Paving Slabs On A Filtering Geotextile, • Construction Of A Hardening With A Geogrid On A Filtering Geotextile, • Construction Of A Mesh Fence, A Gate And A Wicket Within The Planned Hardening, • Installation Of A Set Of Photovoltaic Devices With Power Up To 2Kwp, • Installing A Radio Communication Device (Gsm Camera) On The Tank Along With Accessories (Lighting) With A Height Of Over 3M,• Installation Of Automatic Systems For Quick Monitoring, Early Warning And Response To Threats On The Retention Reservoir; Installation Of A Radar Probe On The Discharge Structure; Installation Of Electric Drives For The Bicuspid Valve; Connection Of Power Supply, Automation And Alarm Systems To The Power Supply And Control Switchboard; Connection And Synchronization Of The Designed Monitoring System With The Existing Modern Boomerang System Responsible For Managing And Monitoring The Operation Of Water Devices Rainfall;• Construction Of Floating Modules With Vegetation (Floating Islands),• Installation Of A Set For Aerating Water Reservoirs With An Aeration Pipe,• Reconstruction Of The Area Adjacent To The State Before The Commencement Of The Works. Western Reservoir:• Earthworks,• Construction Of An Advance Cable Connection Using The Linear Excavation Method,• Construction Of A Road Surface With Road Slabs And A Strip Of Paving Slabs On Filter Geotextile,• Construction Of Hardening With Concrete Cubes On Filter Geotextile• Construction Of A Mesh Fence, Gate And Wicket Within The Planned Hardening Area,• Installation Of A Set Of Photovoltaic Devices With A Power Of Up To 2Kwp,• Installing A Radio Communication Device (Gsm Camera) On The Tank Along With Accessories (Lighting) With A Height Of Over 3M,• Installation Of Automatic Systems For Quick Monitoring, Early Warning And Response To Threats On The Retention Reservoir; Installation Of A Radar Probe On The Discharge Structure; Installation Of Electric Drives For The Bicuspid Valve; Connection Of Power Supply, Automation And Alarm Systems To The Power Supply And Control Switchboard; Connection And Synchronization Of The Designed Monitoring System With The Existing Modern Boomerang System Responsible For Managing And Monitoring The Operation Of Water Devices Rainfall;• Construction Of Floating Modules With Vegetation (Floating Islands),• Installation Of A Set For Aerating Water Reservoirs With An Aeration Pipe,• Reconstruction Of The Area Adjacent To The State Before The Commencement Of The Works. Western Reservoir - Człuchowska• Earthworks,• Construction Of A Sheet Piling Made Of Steel Sheet Piles,• Construction Of A Pre-Meter Cable Connection Using The Linear Excavation Method And The Directed Drilling Method,• Construction Of A Surface Made Of Road Slabs And A Strip Of Concrete Slabs, • Constr
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.