Part 1 - Modernization Of The Cultural Center In Podhorce:1) Laying Floors With Stoneware Tiles In Passageways And Utility And Storage Rooms.2) Replacing The Floor With Panels In The Workshop Room3) Removing Decorative Plaster Wall Coverings, Painting The Rooms4) Replacing Internal Window Sills With Window Sills Made Of Conglomerate. 3 Cm5) Reconstruction Of The Partition Wall In The Social Room6) Separation Of A Storage Room Next To The Auditorium7) Replacement Of Stage Curtains And Control Mechanisms8) Replacement Of The Sound System And Stage Lighting9) Delivery Of A Projection Screen And Stage Equipment10) Reconstruction Of The Toilet And Shower On The Ground Floor11) Delivery And Installation Of Water Treatment Filters Under The Sinks12) Installation Of Air Conditioning In The Hall Entertainment Hall13) Installation Of New Electrical Equipment14) Renovation Of The Electrical Switchboard15) Increasing The Number Of Sockets Within The Stage And Social Room16) Power Supply For The Stage Lighting On The Truss Above The Audience17) Delivery, Assembly And Commissioning Of The Equipment Specified In The Documentation And Bill Of Quantities. The Order In Part 1 Covers The Comprehensive Implementation Of The Task Of Renovating The Building Of The Community Center, Along With The Delivery And Installation Of Equipment Constituting An Integral Part Of The Facility. The Scope Of The Order Includes Both Construction Works And Supplies Along With Their Installation And Commissioning. The Ordering Party Decided That Dividing The Order Into Parts Within The Scope Of Part I Of The Order (I.E. Separate Construction Works And Supplies Of Equipment) Is Inappropriate For The Following Reasons: Functional And Technological Integrity Of The Order. A Significant Part Of The Supplies Includes Elements Requiring Permanent Assembly And Direct Connection With Construction Works (Including Mirrors, Hangers, Stage Lighting Mounted To The Structure, A Sound System With Cabling In Hidden Installations). The Implementation Of These Elements Requires Close Coordination With The Course Of Construction Works And Adaptation To The Technical Conditions Arising During The Implementation Of The Investment. The Need To Ensure Proper Coordination Of Works And Deliveries. Division Of The Order Could Lead To Significant Organizational And Logistic Difficulties, In Particular In Terms Of Harmonization Of Implementation Deadlines. There Is A Risk That The Supply Contractor Will Not Be Able To Adapt To The Actual Progress Of Construction Works, Which Could Result In The Need To Store Equipment Elements, Delays Or Their Damage. Responsibility For Implementation And Quality Of Workmanship. Entrusting The Execution Of The Order To One Contractor Ensures A Clear Definition Of Responsibility For The Entire Task, Including The Correct Execution, Compatibility And Cooperation Of All Elements. In The Event Of Division Of The Order, There Could Be Competence Disputes Between The Contractors, In P
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.