Electric Motors, Generators And Transformers – Tender For Agreement Regarding Hybrid Onshore Power System At Port Of Aalborg. The Tender Is Carried Out By Port Of Aalborg A/S, Vejdybet 16, 9220 Aalborg Øst, Cvr. 12473192 (Hereinafter Port Of Aalborg), Which Pursuant To Fvd Art. 4, Subsection 1, Letter A Is The Contracting Entity. The Tender Is Carried Out In Accordance With Directive 2014/25/Eu Of The European Parliament And Of The Council Of 26 February 2014 On The Procedures For Entering Into Contracts Within Water And Energy Supply, Transport And Postal Services And On The Repeal Of Directive 2004/17/Ec (Hereinafter Fvd) Art. 48 As A Competitive Dialogue. Prior To The Tender, Port Of Aalborg Has Conducted A Market Dialogue With, Among Others, Potential Suppliers. The Market Dialogue Showed That Port Of Aalborgs Needs Cannot Be Met Without Adaptation Of Already Available Solutions, And That The Agreement Includes Design And Innovative Solutions. The Assessment Is, Among Other Things, Based On The Fact That The Delivery Is Expected To Be Able To Deliver Shore Power With High Power Peaks (Up To Approx. 2 Mw) And Different Voltage Levels (Including 400–450 V And 6.6 Kv), Integrate A Battery Storage (Bess) And Is Delivered With A Cable Management System (Cms) Suitable For Operation In An Atex Zone 2 Environment At The Oil Port. In View Of This, The Tender Is Carried Out As A Competitive Dialogue. Port Of Aalborg Will Prequalify Three (3) Applicants. Port Of Aalborg Has Also Had A Feasibility Study Prepared By Leap As Part Of The Market Dialogue. Port Of Aalborg Has, In Accordance With Fvd Art. 58 - 59 Published Relevant Information That Has Been Exchanged With Leap, As Well As Set Deadlines For Receiving Applications And Offers, So That They Compensate For Any Time Advantage. The Relevant Information Is Attached As Appendix A. The Project Concerns The Tendering Of The Agreement Regarding The Hybrid Onshore Power System At Port Of Aalborg (Hereinafter The Agreement). The Scope And Content Of The Project Are Described In More Detail In The Agreement With Annexes. Port Of Aalborg Wishes To Enter Into One Overall Agreement On The Tendered Supply. Port Of Aalborg Wants To Establish A System That Can Supply Electricity (Shore Power) To The Ships That Call At The Port. The System Must Also Be Able To Supply Electricity To The Ports Mobile Cranes, Which Are Being Continuously Replaced With Electric Hybrid Versions. Traditionally, The Task Is Solved Through The Establishment Of A Network Of Cables And Cable Cabinets, Supplied From The Electricity Grid. Since The Port Of Aalborg Has 5,600 Meters Of Quay, The Establishment Costs For This Will Be Considerable. Instead, The Port Of Aalborg Wants To Establish A Mobile System With Large Batteries As A Supply. The System Must Be Built In Standard Containers So That It Can Be Easily Handled And Employed In All The Ports Quay Areas. We Want 2 Pcs. Ops Units Which Can Deliver Up To 1.25 Mw Power In The Voltage Range 400-690 V And 50/60 Hz System. For This, A Total Battery Capacity Of 10 Mwh And An Output Of 1.25 Mw Distributed Over 2-3 Containerized Units Is Desired. In Order To Achieve A Better Return On Investment, The Batteries Must Be Designed To Also Function As A Traditional Bess System, So That These Can Be Sold As Stabilization Of The Electricity Grid. A Centrally Located Area On Østhavnen Is To Be Established
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.