Tenders Are Invited For Construction Of Sections Of The Water Supply Network In The Kowala Commune

Tender Detail

111279103
ZP.271.2.2026
Self-Funded
Tenders Are Invited For Construction Of Sections Of The Water Supply Network In The Kowala Commune
NCB
central europe
European Union
17-04-2026

Work Detail

The Scope Includes The Construction Of Four Sections Of The Water Supply Network In The Kowala Commune Located In The Following Towns: 1. Kowala Kolonia Plot Registry No.: 2095/24, 2095/30, 2083 District 0012 Kowala, Ø 110 Mm, L=156.0 M2. Kosów Węży, Plot Registry Numbers: 1080/114, 1080/118, 1080/89, Precinct 0009- Kosów Węży, Ø 160 Mm, L = 359.0 M3. Augustów, Plot Registry Numbers: 66, 76/4, District 0001 Augustów, Ø 90 Mm, L = 307.5 M4. Maliszów Plot Registry Number: 35, 881, Precinct 0016 Maliszów, Ø 90 Mm, L= 116.0 M To Be Performed, Among Others: Measuring Works For Linear Earthworks, Assembly Works, Tests Of The Water Supply Network, Tests Of The Water Supply Connection, Drainage Works. A Detailed Description Of The Subject Of The Order, Including The Scope Of Works, Execution Technology And Specifications Of The Works, Are Included In The Design Documentation And The Technical Specification For The Execution And Acceptance Of Construction Works (Stwiorb), The Bill Of Quantities Constituting An Annex To The Swz And The Draft Provisions Of The Agreement. The Contractors Obligations In Particular Include: A) Notification Of The Intended Commencement And Completion Date Of The Works To The Competent Construction Supervision Authority, B) Restoring The Area In The Places Where The Works Were Carried Out To Its Original Condition Before Taking Over The Surface Of The Paved And Unpaved Roads And Bituminous (Repair Technologically As Before Occupation), Plot Areas, Etc. In The Case Of Dirt Roads, Hardening Should Be Done With Aggregate Of Fraction 0-31.5 With A Density Of Up To 10 Cm Deep, Sections Of Hardened Roads Should Be Profiled And Hardened With The Indicated Aggregate, C) The Works Should Be Performed In Accordance With Currently Applicable Standards, D) Preparation Of The Bioz Plan By The Construction Manager And Submission On The Day Of Concluding This Agreement And Obtaining The Approval Of The Inspector Supervision, E) Preparation Of A Traffic Organization Project For The Duration Of Construction, Which Is Subject To Agreement And Approval By The Competent Authority - If Applicable, F) Implementation, At Your Own Expense, Of The Necessary Security For The Works And All Shields, Marking The Work Area, Ensure Access To And Access To The Property For Residents, Shops And The Fire Brigade, Emergency Services, Etc., G) Obtain A Decision On The Occupation Of Road Lanes And Incurring Costs In This Respect - If They Arise At This Stage From The Road Administrator In The Case Of District Roads, Voivodeships, Etc. - Does Not Apply To The Manager With Whom The Agreement For The Implementation Of The Investment Task Referred To In §1 Of The Agreement Was Signed, H) Take Into Account All Elements Affecting The Offer Price (Lump Sum) Of The Subject Of The Order. Obligations Of The Contractor With The Competent Authorities: A) According To The Positions Of The Competent Authorities, The Contractors Obligation Is To Notify At Least 7 Days In Advance

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 667e8d88-9141-4d0c-81ab-ca7188b809bd.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail