The Subject Of The Order Is The Partial Renovation Of Building No. 4 Located In The Military Complex In Malbork At Ul. Jagiellońska 161.1 Scope Of Works: Basic Task: A) In Room No. 013-019, 023-024 And Adjacent Corridors: - Partial Demolition Of Floors And Substructures Of Basement Rooms; - Carving Out Door Joinery From The Walls; - Execution Of Concrete Substructures And Floors; - Single-Row Injection Of Internal Walls; - Execution Of Moisture-Proof Insulation With Asphalt Felt; Execution Of Renovation And Cement-Lime Plasters; Execution Of Gypsum Plasters On Walls And Ceilings; Painting Works; Construction Of Central Heating And Water And Sewage Pipe Casings. K-G Boards On Metal Grates; - Covering Floors With Ceramic Tiles; - Installation Of Steel Door Joinery; - Partial Replacement Of Central Heating Pipes With Installation Of Radiators; - Replacement Of Part Of The Electrical Installation With Accessories. Foundations; Single-Row Injection Of External Walls; Waterproofing Of Foundation Walls; Partial Replacement Of Lightning Protection System Cables Along With Replacement Of Earthing Electrodes; Making A Strip Of Concrete Paving Stones. Investors Materials Basic Task: - Concrete Paving Stones 5680Pl1798943 In The Amount Of 16.23 M2 - Solid Building Brick 5620Pl0268277 In The Amount Of 110.00 Pcs. - Clinker Brick 5620Pl1131598 In The Amount Of 1,072.00 Pcs. - Clinker Brick 5620Pl1568889 In The Amount Of 239.00 Pcs. - Floor Tiles 5620Pl1791949 In The Amount Of 192.37 M2 - Lighting Pole. St3/1Xr10/1X04 Height 500Mm 6210Pl1533741 In Quantity Of 1.00 Sets. Cast Iron Channel Manhole Type Ao-600 5340Pl1671017 In The Amount Of 1.00 Pcs. Other Materials Are Provided By The Contractor. 1.2 Scope Of Works: Option Right: A) In Rooms No. 301-318 And Adjacent Corridors: Partial Demolition Of Pvc Floors And Ceramic Tiles; Doors; Execution Of Leveling And Smoothing Screeds; Application Of Gypsum Plasters On Walls And Ceilings; Painting Works; Installation Of Floors With Homogeneous Pvc Floor Coverings Of 2 Mm Thickness, Utility Class 34/43; Installation Of Wooden Door Joinery, Replacement Of Part Of The Electrical Installation Together With Accessories. Note: The Subject Of The Contract Will Be Performed In A Facility Used In Hours 730-15 30 From Monday To Friday. Order Completion Date: A) Basic Order: 8 Weeks From The Date Of Handing Over The Construction Site B) Order Executed Under The Option Law: 4 Weeks From The Date Of Handing Over The Construction Site, Which Will Take Place No Later Than The 17Th Week From The Date Of Signing The Contract.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.