1. The Subject Of The Order Is The Execution Of The Task Entitled: Construction Of An Economic And Meeting Building In Psary, Wisznia Mała Commune In The Design And Build Formula, With The Necessary Equipment And Land Development Including, Among Others: :And. Design And Construction Of A Single-Story Utility And Meeting Building Without A Basement With A Usable Area Of Min. 138 M2 Constructed In Container/Modular Technology With Technical Infrastructure Within Part Of Plot No. 295 In Psary, Commune. Wisznia Mała. A Building With A Flat Roof And A Terrace Partially Covered With A Pergola. The Building Will Consist Of A Vestibule, A Meeting Room, A Kitchen, A Pantry, Two Toilets And A Utility Room;B. Design And Construction Of All Necessary Installation Connections; C. Construction And Development Of The Area, Including: Construction Of An Above-Ground Terrace Of Approx. 45 M2, Construction Of Parking Spaces For Passenger Cars, Construction Of Lawns And Planting Shrubs And Trees, Construction Of Pedestrian Routes And Sidewalks, Area Lighting, Installation Of Small Architecture Devices; D. Supplies Of Construction And Installation Equipment;E. Construction Of A Pv Installation With An Energy Storage Facility.2. The Subject Of The Contract Is Divided Into Two Parts: 1) Design Part: The Subject Of The Contract Is The Preparation Of A Full-Discipline Construction And Executive Design For The Construction Of An Economic And Meeting Building Along With Land Development In Accordance With The Regulation Of The Minister Of Infrastructure Of September 11, 2020 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works, And The Functional And Utility Program. (Journal Of Laws Of 2020, Item 1609). Full-Discipline Construction And Executive Designs Should Be Developed On The Basis Of The Functional And Utility Program Constituting Part Ii Of The Swz. The Above-Mentioned Scope Of Construction And Executive Designs Includes Studies Detailed In The Ffu, Which Is An Integral Part Of This Contract.2) Executive: A) Execution Of All Works That Are The Subject Of The Contract In Accordance With The Construction Design (Pb) And Executive Design (Pw) Approved By The Ordering Party, B) Delivery And Assembly Of Construction And Installation Equipment To The Extent Specified In The Program Functional And Utility (Ffu), C) Preparation Of As-Built Documentation After Completion Of Construction Works.3. The Implementation Of The Subject Of The Contract Also Includes Formal And Legal Proceedings Leading To Obtaining The Necessary Arrangements, Resolutions And Administrative Decisions, Along With Obtaining A Final Building Permit Decision/Certificate Of No Objection To The Submitted Works And A Final Occupancy Permit Decision/No Objection Certificate To Submit The Completion Of The Works.4. The Detailed Scope Of Work Is Specified In The Functional And Utility Program (Ffu) And The Description Of The
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.