GTR 111225328

Tenders Are Invited For Construction Of A Pedestrian And Bicycle Path On The Section From Ul. Miłolesna In Grudziądz To Dębieniec

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
111225328
Tendering Authority
Subscribe to view
Tender No
ZP.271.1.12.2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of A Pedestrian And Bicycle Path On The Section From Ul. Miłolesna In Grudziądz To Dębieniec
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
16-04-2026 Closed
Work Detail
Construction Of A Pedestrian And Bicycle Path In The City Of Grudziądz. The Scope Of The Investment Includes A Wide Range Of Preparatory Works, Including Surveying Works, Tree Felling, Demolition Works, As Well As Securing And Rebuilding External Facilities. Then, Earthworks Were Planned, Including Excavations And Embankments, As Well As The Construction Of A Drainage System In The Form Of An Infiltration System Ensuring Proper Drainage Of Rainwater. The Key Stage Will Be The Construction Of The Foundation - From Profiling And Compacting The Subgrade, Through Drainage And Cut-Off Layers, Cleaning And Condensing The Construction Layers, To The Foundation Made Of An Unbound Aggregate Mixture. The Prepared Structure Will Feature Improved Hard Surfaces And Unimproved Surfaces, Adapted To The Function And Character Of Individual Sections Of The Route. The Investment Also Includes Finishing Works, Including Adjustment Of Existing Ditches, Installation Of Street Elements (Curbs And Concrete Sidewalk Edges), Installation Of Horizontal And Vertical Markings, Installation Of Pedestrian Traffic Safety Devices And Small Architecture Elements. The Task Also Includes Development Of Road Greenery And Appropriate Protection And Marking Of Works Carried Out In The Road Area. An Important Element Of The Project Will Be The Construction Of A Pedestrian And Bicycle Crossing On The Existing Culvert. Basic Technical Data • Length Of The Pedestrian And Bicycle Path - 1.071 Km • Technical Parameters Of The Pedestrian And Bicycle Route Were Adopted For Class Z With A Width Of - 2.00 M-2.50 M. On The Section In Question, The Bicycle Path Is Located Next To The Road. Behind Struga Marusza, A Crossing For Cyclists Has Been Designed, And Further To The Border Of Grudziądz The Bicycle Path Is Located Outside The Existing Dirt Roadside. Wood Obtained From Felling Is The Property Of The Commune - The City Of Grudziądz (According To The Attached Documentation). The General Contractor Is Obliged To Obtain An Administrative Decision - An Occupancy Permit. A Detailed Description Of The Subject Of The Order Is Included In The Technical Documentation Constituting Annex No. 8.1 To The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
32d524e9-c8d6-49b5-830f-1c692a8461f5.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders