GTR 111155909

Tenders Are Invited For Construction Work For Water Projects – Replacement Of The Herbrum Lock - Procurement Package 3: Hydraulic Engineering, Special Civil Engineering, Structural Engineering, Earthworks

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
111155909
Tendering Authority
Subscribe to view
Tender No
215398-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work For Water Projects – Replacement Of The Herbrum Lock - Procurement Package 3: Hydraulic Engineering, Special Civil Engineering, Structural Engineering, Earthworks
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
11-05-2026 Closed
Work Detail
Construction Work For Water Projects – Replacement Of The Herbrum Lock - Procurement Package 3: Hydraulic Engineering, Special Civil Engineering, Structural Engineering, Earthworks. The Contractor Of Award Package 3 (Vp 3) Assumes Overall Technical Responsibility For The Structural Implementation Of The Lock System. This Includes The Complete, Contractually And Quality-Compliant Construction Of All Structures, Including Construction Conditions, Temporary Structures And Ancillary Facilities. The Contractor Of Vp 3 Ensures That The Approved Planning Of Vp 1 Is Implemented Professionally, That The Construction Conditions Are Coordinated With The Technical Systems Of Vp 2 And That The Functional Requirements Of The Specifications Are Fully Met. The Alliance Partner Actively Participates In Interface Coordination, Scheduling And Risk Management. Responsible Services: - Responsible For Civil Engineering, Hydraulic Engineering, Solid Engineering, Earthworks, Special Civil Engineering And Structural Engineering - Within The Framework Of The Deep Foundation, Responsible For The Manufacture Of The Lock Chamber, Heads, Foundations, Floor Slabs And Ancillary Structures, - Compliance With Legal Requirements And Execution Of Dismantling, Removal And Recycling Processes - Dismantling And Site Clearance Of Existing Systems, Profiling Of The Excavation Pits And Bank Areas, Production Of Excavation Pit Protection (Sheet Pilings, Grouted Anchors, Spar Beams, Stiffeners), - Assembly And Integration Of Structural Steel Structures Such As Portals, Walkways, Maintenance Platforms And The Attachment Of Connecting Structures - Implementation Of The Approved Construction States, Intermediate Construction States And Temporary Solutions, - Ensuring Coordination And Compatibility Between Structural Construction States And The Technical Systems Of Vp 2, - Setting Up And Operating The Construction Site, Including Traffic And Logistics Areas, Protective Devices, Lighting, Signage, Structural Infrastructure, Shore Power Supply And Other Road Construction Measures - Implementation Of The Construction Processes In Contract Phase 2, Taking Into Account Schedules, Construction Statuses And Temporary Constructions, - Optimization Of Construction Processes, Construction Processes, Temporary Construction And Excavation Concepts, - Creation Of Verifiable Documentation Of The Completed Construction Work And Handover To Vp 2 For Assembly And Commissioning. Interfaces To Award Package 1 (Planning And Integration): - Coordination Of The Approved Construction Planning And Construction Conditions, - Advice On The Development And Optimization Of Construction Processes, Temporary And Excavation Pit Concepts, - Feedback On The Structural Feasibility Of The Planning, - Coordination Of The Scheduling And Technical Specifications For The Technical Integration And Compatibility Of Vp 2. Interfaces To Award Package 2 (Technical Equipment): - Provision Of Built-In Parts, Support Points, Foundations And Construction Conditions Suitable For Assembly, - Coordination Of The Assembly And Installation Processes Of The Technical Systems With The Construction Progress, - Coordination To Avoid Technical Collisions - Ensuring The Structural Requirements For Assembly And Commissioning, - Coordination Of The Construction Statuses To Integrate The Technical Equipment, - Support With Baulogis
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
67f29eb8-8ca0-43fa-9939-3f82ce216feb.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders