GTR 111143885

Tenders Are Invited For Parts Of Hydraulic Power Engines Or Motors – Adapted Procedure

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
111143885
Tendering Authority
Subscribe to view
Tender No
218278-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Parts Of Hydraulic Power Engines Or Motors – Adapted Procedure
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
17-04-2026 Closed
Work Detail
Parts Of Hydraulic Power Engines Or Motors – Adapted Procedure. The Purpose Of The Contract Is To: - Carry Out Design Studies And Associated Plans For The New Oleo-Hydraulic Safety Brakes Of The Evcrd Valve Operating Winches Based On The Technical Specifications Given - Draw Up A Quality Assurance Plan - Manufacture / Test In The Factory / Deliver To An Integrator / Attend Empty Workshop Tests / Attend Tests On Site Under Load, Of The Brakes Of The 3 New Evcrd Operating Devices - Supply And Equip With The Factory Accessories And Sensors - Provide A Batch Of Spare Parts And Consumables - Provide Up-To-Date Plans As Built, Reports, Minutes, Administrative And Technical Documents (Paq) Of Manufacturing And Testing In An End-Of-Business File - Provide A Guarantee And Ensure Its Continuity Between The Different Testing Phases These Brakes Are Designed And Manufactured To Be Equipped On Maneuvering Skids Themselves Intended To Control The Safety Organs Of A Hydroelectric Dam, In 2 Phases: During The 1St Phase Of The Project Between May 2026 And November 2027: Replacement Of The Operating Elements On The Right Bank Flood Evacuator Valve N°3 (Evcrd3) Supply The Pair Of Brakes For The Firm Section (Between July 2026 And March 2027): -Studies, Plans And Paq - Factory Manufacturing - Factory Tests - Delivery To An Integrator - Participation In Empty Tests In The Workshop Integrator: Components Installed On Maneuvering Skid - Participation In On-Site Load Tests: Components Installed On Maneuvering Skid Integrated On Evcrd3 - Study File, Paq, Plans Updated As Built - 24-Month Warranty 2Nd Phase Of The Project Between November 2027 And February 2029 On Evcrd2 And Evcrd1 Simultaneously Supply The Two Pairs Of Brakes Of The Optional Phase (Between November 2027 And July 2028): - Integrate The Rex Of Phase 1 - Update Studies, Plans And Paq - Factory Manufacturing - Factory Tests - Delivery To An Integrator
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
b5997cf6-2fc0-4c24-b8bb-72f8a1b3bf9e.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you