Crushed Stone To Strengthen The Soil. A Layer Of Gravel With A Fraction Of 20-40; The Volume Of Loading Material Is 24M3. Availability Of Guarantee, Certificates Of Conformity, Test Report From Sanpin Control, Steel Pipe D-100Mm (114*4Mm) L=12 Gost 10704-80, Steel Pipe D-200Mm (219*5Mm) L=12 Gost 10704-80, Crushed Stone To Strengthen The Soil. A Layer Of Gravel With A Fraction Of 40-80; The Volume Of Loading Material Is 62M3. Availability Of Guarantee, Certificates Of Conformity, Test Report From Sanpin Control
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.