Road Construction Works – Securing The N7 Between Fridhaff And Weiswampach – Section 1 – Lot 3.3 Lipperscheid-Hoscheid-Dickt. Carrying Out The Security Of The N7 Over A Length Of 2020 M, Pipeline Works, Retention Basins, Networks, Drainage, Road Works. Excavated Material: 57,000 M3 Backfill Using Excavated Materials 27,000 M3 Various Filler Materials 36,000 M3 Excess Materials To Be Removed 30,000 M3 Supply Of Lime/Cement Mixture: 670 T Coated Materials: 9,500 To Krc Implementation: 7,500 M3
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.