The Subject Of The Order Concerns Construction Works Consisting In Comprehensive Energy Modernization Of The Facility Consisting Of: A Gymnasium At The Primary School. Irena Sendlerowa In Wola Along With Facilities And A Residential Building.I. The Scope Of Work In The Municipal Building Includes In Particular: 1. Thermal Modernization Of External Walls: • Removal Of Unnecessary Layers, Replenishing Plasters • Thermal Modernization Of External Walls • Plasters, Finishing Works, Downpipes, Flag Holders, • Disassembly Of Old And Installation Of New Window Sills, 2. Replacement Of External Main Doors:• Disassembly Of Existing Doors• Installation Of New Doors• Internal Flashings. And External 3. Thermal Modernization Of External Foundation Walls:• Excavation Of The Foundation Wall• Removal Of Unnecessary Layers, Replenishment Of Plasters• Damp-Proof Insulation, Waterproofing Compound• Thermal Modernization Of External Walls• Layer Of Mesh And Glue• Layer Of Dimpled Foil• Finishing Works• Paving Stone Band Around The Building4. Renovation Of Entrance Stairs:• Disassembly Of Old Ones And Installation Of New Ones• Laying Anti-Slip Stoneware On The Stairs• Finishing Works5. Thermal Modernization Of The Roof:• Removal Of Unnecessary Layers, Supplementation Of Layers• Thermal Modernization Of The Roof, Insulation• Replacement Of Electrical And Lighting Installations• Replacement Of Gutters, Downpipes• Replacement Of The Lightning Protection System• Finishing Works • Sheet Metal Works6. Installation Of External Lighting:• Dismantling Of Old Installations, Laying New Cables For The External Lighting Installation.• Installation Of New Lamps - 3 Pcs.7. Demontaż Drewutniii. The Scope Of Work In The Gym Includes In Particular: 1. Floor Renovation:• Disassembly And Relocation Of Equipment• Removal Of Layers Of The Existing Floor In The Gymnasium• Installation Of New Layers Of The Designed Floor, Insulation• Performing Treatments• Cleaning And Installation Of Equipment2. Replacing Radiators:• Disassembly Of Radiators• Installation Of Radiators• Finishing Works3. Thermal Modernization Of External Walls:• Removal Of Unnecessary Layers, Replenishing Plasters• Thermal Modernization Of External Walls• Plasters, Finishing Works, Downpipes, Flag Holders, Lighting.4. Thermal Modernization Of External Foundation Walls:• Excavation Of The Foundation Wall• Dismantling Of Stairs• Removal Of Unnecessary Layers, Replenishing Plasters• Thermal Modernization Of External Walls• Reconstruction Of Stairs With Adaptation For Disabled People• Finishing Works• Installation Of Railings5. Replacement Of Windows:• Disassembly Of Existing Windows• Installation Of New Windows• Internal Treatments. And Exterior, Installation Of Window Sills6. Replacement Of External Main Doors:• Disassembly Of Existing Doors• Installation Of New Doors• Internal Flashings. And External 7. Thermal Modernization Of The Roof:• Removal Of Unnecessary Layers, Supplementing The Layers• Thermal Modernization Of The
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.