Tenders Are Invited For Execution Of An Investment Task Called Construction Of A Skate Park At Ul. Sikorskiego In Nowy Targ

Tender Detail

111036710
ZP.271.18.2026
Self-Funded
Tenders Are Invited For Execution Of An Investment Task Called Construction Of A Skate Park At Ul. Sikorskiego In Nowy Targ
NCB
central europe
European Union
13-04-2026

Work Detail

1. The Subject Of The Order Is The Execution Of An Investment Task Called Construction Of A Skate Park At Ul. Sikorskiego In Nowy Targ.2. The Scope Of The Order Includes: 1/ Earthworks - Leveling And Slopes Of The Area, 2/ Construction Of A Skate Park And Construction Of Hardened Surfaces Along With Equipping The Area In Question With Small Architectural Objects, 3/ External Lighting And Monitoring Installations, 4/ Linear Drainage.3. The Order Is Detailed In The Design Documentation Prepared By Mrs. Marlena Pilch Running A Business Under The Name Marlena Pilch Pro Architektura With Its Registered Office At Ul. Poznańska8/83, 30-012 Kraków.4. Other Provisions Regarding The Subject Of The Order: 1/ Remuneration For The Execution Of The Subject Of The Order In The Form Of A Lump Sum Settlement, Bill Of Quantities Constituting An Annex To The Swz And Is Of An Auxiliary Nature, 2/ The Contractor Will Prepare A Price Offer Based On All Elements Of The Design Documentation And Submit It In The Form Of A Table Of Integrated Elements According To The Template Constituting An Annex To The Offer Form, 3/ Before Signing The Contract, The Contractor Will Present To The Ordering Party For Approval A Material And Financial Schedule Prepared According To The Items In The Table Of Integrated Elements Included In The Offer Form, 4/ The Contractors Remuneration Will Be Payable Based On The Material And Financial Schedule, Through Partial Invoices Issued On The Basis Of Partial Protocols, 5/ The Works Should Be Performed In Accordance With The Design Documentation, Bill Of Quantities, Sst While Maintaining The Conditions Resulting From The Technical Standards For The Execution And Acceptance Of Construction Works, 6/ All Necessary Materials With Quality Certificates Or Declarations Of Conformity Confirming Their Use In Construction Are Secured By The Contractor At Their Own Expense, 7/ The Removal And Storage Of Rubble Is Secured By The Contractor, Bearing All Related Costs, 8/ The Contractor Will Ensure Safe Conditions On The Site Construction Site And Its Surroundings,9/ Before Submitting The Offer, It Is Recommended To Make A Site Visit To The Construction Site,10/ Before Signing The Contract, The Contractor Will Provide An Offer Cost Estimate For The Above-Mentioned Implementation. Investment Task, 11/ The Contractor Will Insure The Works Against Damage That May Occur In Connection With Specific Random Events And Against Civil Liability, 12/ The Contractor Will Inform The Ordering Party About The Date Of Covering The Works That Need To Be Covered And The Date Of Acceptance Of The Missing Works; If The Contractor Has Not Informed The Ordering Party About These Facts, He Is Obliged, At His Request, To Discover The Works Or Make Holes Necessary To Examine The Works, And Then Restore The Works To Their Original Condition,13/ The Contractor Will Bear All Necessary Costs Related To The Implementation Of The Construction Works In Question, Including, But Not Limited T

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 17c18476-2533-4a3e-84c4-b471b4f5c903.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail