Tenders Are Invited For Construction Of A Reserve Water Treatment Plant, Intended To Provide An Independent Source Of Water Supply, In Particular To Supply The Planned Shelter In The Town Of Gostycyn
Tenders Are Invited For Construction Of A Reserve Water Treatment Plant, Intended To Provide An Independent Source Of Water Supply, In Particular To Supply The Planned Shelter In The Town Of Gostycyn
The Subject Of The Order Is The Construction Of A Reserve Water Treatment Plant, Intended To Provide An Independent Source Of Water Supply, In Particular To Power The Planned Shelter In The Town Of Gostycyn.) Together With A Water Intake, Transmission, Treatment And Distribution System. The Scope Of The Order Will Include In Particular: On: Equipping Deep Wells On Plots No. 519/4 And 519/2 Along With New Above-Ground Casings Installation Of Retention Tanks On Plot No. 519/146 Reconstruction Of The Treatment Plant Building On Plot No. 519/146 Construction Of A Washing Water Settling Tank On Plot No. 519/146 Installation Of Technological Equipment In The Suw Building: Iron And Manganese Removal Filters, Installation Of A Central Air Aerator, Installation Of The Iio Pumping Station, Installation Of Process Lines Made Of Acid-Resistant Steel Pipes With Fittings, Installation Of Compressors And An Air Blower, Installation Of The Electrical Installation And Control Cabinet, Construction Of An Entrance Gate To Room Filter Hall With Construction Of A Door Opening. Doors With U Coefficient = 1.3 W/(M2k). A Double-Leaf Gate With One Main Wing, Which, When Opened, Will Allow For A Passage Opening Of 90 Cm. Construction Of New Door And Window Openings In Accordance With The Technical Design Projections And In Accordance With The Joinery List. Chipping Off Loose Internal And External Plasters. Room Outside The Filter Hall. With The Shape Of Water Drains – Technical Stoneware 30X30cm Min. Class R9 (Color To Be Agreed With The Investor) Guidelines For Tiles In The Specification For The Execution And Acceptance Of Construction Works. Making Tiles Up To A Height Of 2.0 M From The Floor Level In The Hall And Room. Toilet, Chlorine Plant And Unit (Color To Be Agreed With The Investor) Painting The Walls Above The Tiles In The Filter Hall With Emulsion Paints Resistant To Increased Amounts Of Moisture. Making New Internal Plasters On The Walls And Ceilings With Cem-Wap. Painting The Ceilings Outside The Hall With Emulsion Paints Resistant To Increased Amounts Of Moisture. Making New Penetrations In The Existing Flat Roof And Installing New Installations Mechanical And Gravity Ventilation Of The Selected System In Accordance With Industry Guidelines Construction Of New Ventilation In The Newly Designed Flat Roof Above The Filter Hall. Construction Of A New Roof Covering From Trapezoidal Sheet Metal Along With New Sheet Metal Flashings According To The Drawings And Description, And Construction Of New Layers Of The Flat Roof In Accordance With Cross-Sectional Drawing A-A Construction Of A Foundation For The Pump Hydrophore Set And For The Filter Tanks And The Aeration Tank In Accordance With Attached Construction Drawings. Construction Of New Foundations For The Columns In Accordance With The Construction Drawings In Order To Support The New Roof Truss And Stiffen The Building. Construction Of A New Roof Covering From Blue Trapezoidal Sheet Met
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.