1. The Subject Of The Order Are Construction Works Consisting In The Renovation Of Rooms With Adaptation To Currently Applicable Regulations And Standards In Part Of Building No. 45 In Jw. In Złocieniec.2. The Contractor Undertakes To Perform The Subject Of The Contract In Accordance With The Applicable Technical And Construction Regulations, With The Material Scope Specified In The Technical Documentation (Project), Technical Specification For The Execution And Acceptance Of Construction Works (Hereinafter Referred To As Stwiorb), Decisions, Opinions, Arrangements And Specification Of The Terms Of Order (Hereinafter Referred To As Swz), Draft Contract, Constituting The Documentation Of The Execution Of The Subject Of The Contract.3. The Contractor Is Obliged To Keep A Correspondence Journal Used To Record The Course Of Works And Circumstances Occurring In The Course Of Performing The Works. Entries In The Correspondence Journal Should Be Made On An Ongoing Basis And Chronologically. Entries In The Log May Be Made By Persons Designated By The Contractor And The Supervision Inspector Designated By The Ordering Party.4. A Detailed Description Of The Subject Of The Order Is Specified In: 1) Annex No. 1 - Technical Specification For The Execution And Acceptance Of Works; 2) Annex No. 2 - Bill Of Quantities. 3) Annex No. 3 - Draft Contract4) Annex No. 10 - Drawings5. The Subject Of The Order Should Be Performed Based On The Annexes To The Swz And A Site Visit Carried Out During The Contractors Meeting At The Future Work Site. The Statement Of Works And Other Documents Used To Describe The Subject Of The Contract Should Be Treated As Supporting Material. Based On Them And On The Basis Of A Site Visit, The Contractor Will Prepare A Bill Of Quantities On The Basis Of Which He Will Determine The Offer Price. All Works Should Be Carried Out In Accordance With Construction Practice.6. The Ordering Party Will Request The Presentation Of An Offer Cost Estimate Or An Equivalent Document That Was The Basis For Preparing The Valuation At Each Stage Of The Order Execution.7. The Ordering Party Informs That A Meeting Of Contractors Will Be Held To Inspect The Site Of Construction Works In Order To Familiarize Themselves With The Actual Situation.8. The Planned Meeting Of Contractors Will Take Place On: April 7, 2026, At 9.00 In Złocieniec - Information From The Jw Pass Office. In Złocieniec, Ul. Thursdays 4/9. Regarding The Meeting, Please Contact The Person Responsible: Mr. Wojciech Pół-Torak, Tel. 261 465 724, Or Mr. Marek Serkowski, Tel. 261 465 72210. The Meeting Referred To Above Is Not A Meeting Of Contractors Referred To In Art. 285 Upzp. Conducting Any Arrangements With The Above-Mentioned Persons Is Not Binding. All Substantive Inquiries That Arise During And After The Contractors Meeting Should Be Directed To The Ordering Party In Electronic Form Via The Purchasing Platform.11. During The Period Of Execution Of The Order, The Ordering Party Demands That
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.