Foul-Water Piping Construction Work – Construction Of Cut-Off Sewage Pipes In Hedensted (Løsning-Daugård). The Undertaking Includes The Establishment Of Waste Water Pressure Lines West Of Hedensted. In Carrying Out The Contract, The Lines Must Be Established By Excavation As Well As By Carrying Out Controlled Drilling And Microtunneling Under The Railway. The Undertaking Broadly Includes The Following: • Establishment Of Approx. 4,900 M 2 Pcs. Ø355 Pe Waste Water Pressure Line For Excavation. • Establishment Of Approx. 1,900 M Ø160-Ø355 Pe Cables By Controlled Drilling. • Establishment Of 48 M Ø1099 Grp Casing By Microtunneling Under The Railway. • Establishment Of 2 Pcs Ø355 Pe Waste Water Pressure Lines In 48 M Ø1099 Grp Casing • Establishment Of Pressing And Receiving Pits As Dense Sheeting For Microtunneling • Establishment Of 12 Pcs Ø1250-1500 Mm Concrete Wells • Restoration
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.