GTR 110918719

Tenders Are Invited For Prepared By: Design For Tasks Mon. Regulating The Outflow Of Rainwater From The Investment Including The Construction Of A Sidewalk With Drainage. At Dr. Area No. 1323K Czarkówka - Radgoszcz - Luszowice - Lipiny In The Town Of Lipiny

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
110918719
Tendering Authority
Subscribe to view
Tender No
ZDDT.271.8.2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Prepared By: Design For Tasks Mon. Regulating The Outflow Of Rainwater From The Investment Including The Construction Of A Sidewalk With Drainage. At Dr. Area No. 1323K Czarkówka - Radgoszcz - Luszowice - Lipiny In The Town Of Lipiny
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
01-04-2026 Closed
Work Detail
1. The Subject Of The Order Is A Service Consisting In The Development Of Design Documentation For The Task Titled: Preparation Of Design Documentation For The Task Entitled Regulation Of Rainwater Outflow From The Investment Including Construction Of A Sidewalk With Drainage On The District Road No. 1323K Czarkówka - Radgoszcz - Luszowice - Lipiny In The Town Of Lipiny. The Design Study Is To Include The Construction Of A Storm Sewerage Collector With Inspection Wells From The Existing Culvert Located Under The Crown Of District Road No. 1323K, Which Is The Existing Outlet Of The Rainwater Sewerage Collector To The Existing Drainage Ditch Located On The Registration Plot No. 190/1, Lipiny District, In Accordance With The Graphic Attachment Constituting An Annex To This Swz. Currently, The Outlet Of The Existing Culvert (Rainwater Collector) Is Located Approximately 1.0 M Under The Bottom Of The Roadside Ditch, While The Terrain Conditions Do Not Allow The Roadside Ditch To Be Deepened In Such A Way That The Outflow Of Rainwater And Snowmelt Water From The Existing Stormwater Drainage System Would Be By Gravity. Due To The Fact That The Storm Sewage Collector Will Be Run In Sections Under The Bottom Of The Roadside Ditch, It Is Necessary To Construct Two Inspection Wells With A Settling Tank And A Rain Inlet In Order To Collect Rainwater Flowing Through The Ditch In Question. The Detailed Location Of The Planned Investment On The District Road No. 1323K Is Presented In The Basic Map Constituting Annex No. 5 To The Swz. On Its Basis, It Is Possible To Determine Possible Collisions With Foreign Networks.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
6b4b089f-8ea0-4334-83ab-63f7074646ca.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders