Quotation are invited for Overhauling of Flushing Pump at PJRO. COMPLETE OVERHAULING OF FLUSHING PUMP AT PJRO (QTY-1 N0S)SCOPE OF WORK:WORK ACTIVITIES·#PRE- SHUTDOWN DATA COLLECTION OF THE PUMP AT SITE PRIOR TOREMOVAL/OVERHAUL.#·#COLLECT AND RECORD ALL PRE-SHUTDOWN DATA OF THE PUMPS WHICH SHALLINCLUDE ALL THE PARAMETERS SUCH A S SUCTION AND DISCHARGE PRESSURE,VIBRATION READINGS, MOTOR CURRENT ETC.#·#COPIES OF THESE DATA SHALL BE SUBMITTED PRIOR TO COMMENCIN G THEOVERHAUL.#·#PUMP MOTOR AND INSTRUMENTATION DISCONNECTIONS AT SITE (BY DEWA)#·#PUMP DIS-ASSEMBLY AT SITE#·#ARRANGE REQUIRED WOOD EN PLANKS ETC. WHEREVER REQUIRED (MAINLY FORVERTICAL PUMPS), TO UNSCREW PUMP MOTOR FLANGES.#·#DECOUPLE MOTOR AND PUMP BY REMOVING CO UPLING BOLTS OR ANY OTHERAPPLICABLE COUPLING DEVICES.#·#REMOVAL OF ALL AUXILIARY PIPING CONNECTIONS, PLATFORM, STRUCTURE,VENT VALVES AND DISCHARGE PIPE CONNECTIONS FROM DISCHARGE HEADER AND PUTBLIND ON DISCHARGE HEADER END.#·#DRAIN LUBE OIL /GREASE LINES FROM BEAR ING CASING AND REMOVE THE OILINJECTION PIPES WHEREVER APPLICABLE.#·#REMOVE MOTOR PEDESTAL (USE OVERHEAD CRANE WHEREVER AVAILABLE) AF TERDE-COUPLING PUMP THRUST BEARING SHAFTS WHEREVER APPLICABLE.#·#REMOVE THE PUMP BASE BOLTS (CASE OF VERTICAL PUMPS)/ CASING BOLTS(H ORIZONTAL SPLIT CASING PUMPS) AND REMOVE THE PUMP ALONG WITH ITSCASING (VERTICAL PUMP). IN THE CASE OF HORIZONTAL SPLIT PUMPS REMOVE REMOVABLE CASING AND ROTOR SEPARATELY USING OVERHEAD CRANE.#·#TRANSPORT THE PUMP TO SERVICE PROVIDER#S WORKSHOP OR AT FACILITIES ATD EWA PREMISES.#·#PUMP INSPECTION AND OVERHAUL#·#DIS-MOUNT: REMOVE JOURNAL/THRUST BEARING ASSEMBLY, MECHANICAL SEALCARTRIDGE (IF APPLI CABLE) AND PUMP ASSEMBLY.#·#DISMANTLE JOURNAL AND THRUST BEARING ASSEMBLY (IF APPLICABLE) AS PEROEM MAINTENANCE PROCEDURE.#·#CLEAN, INSPECT EVERY COMPONENT FOR WEAR, EROSION, CORROSION ANDRECORD ALL FINDINGS.#·#DISMANTLE MECHANICAL SEAL CARTRIDGE (IF APPLICABLE) A S PER OEMMAINTENANCE PROCEDURE#·#CLEAN AND INSPECT THE PUMP SHAFTS FOR RUN OUT (IF REQUIRED SHALL BESTRAIGHTENED), INSPECT THE IMPEL LER FOR EROSION OR CAVITATION, CARRY OUTNDT ON SHAFT AND IMPELLER, INSPECT THE SHAFT SLEEVES FOR SCORING ORDAMAGES, INSPECT THE RUBBER LINED BEARINGS, WEAR RINGS (WHEREVERAPPLICABLE). RECORD WEAR CONDITION/DIAMETRICAL CLEARANCES OF ALL PUMPPARTS AND COMPARE WITH OEMS MAXIMUM AVAILABLE TOLERANCES. Qty: 1 Palm RO Flushing pump Overhauling work at PJRO For more information, please contact MR- SAMPREETH/0524503218/
[email protected]/ MR MUHAMMAD ALI /
[email protected] STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332600708)/$value