Local Administration, Logistics Support - Vehicle 1.0 Turbo Ousimilar, Without Driver, Base, With On-Track Mixing, From Bica Corrida Improved With 2% Cement, Compacted Using Modified Proctor Energy (Execution, Including Supply And Transport Of Cement, Supply From Bica Corrida, Spreading, Humidification, Homogenization And Compaction Of The Mixture; Excludes Transport From Bica Corrida), Two-Coat Whitewash (Execution, Including Supply And Transport Of All Materials), 100% Proctornormal Landfill Compaction, Hot Machined Bituminous Concrete, Modified By Rubber, Commercial (Range C) (Execution, Including Machining, Application, Spreading And Compaction, Supply And Transport Of Aggregates To The Plant; Excludes Supply And Transport Of Bituminous Material And Transport From The Plant To The Track), Demolition And Removal Of Curbs, Excavation And Loading Of Clay For Paving (Compacted Volume), Excavation, Loading And Transport Of 1St Category Material - Executed With 1, 40 M3 Excavator And 12 M3 Dump Truck And With Service Path In Natural Bed -Dmt From 3,000 To 4,000 M, Flat Plywood Forms With Resin Coating (Execution, Including Deformation, Supply And Transport Of All Materials), Supply Of Asphalt Emulsion For Priming, Supply Of Bituminous Material (No Quote). Cap-50/70 With Rubber, Supply Of Bituminous Material (No Quote). Rr-1C, Discontinuous Milling Of Asphalt Pavement (4 Cm), Priming Without Supply Of Bituminous Material (Execution, Including Transportation Of Bituminous Material Within The Construction Site), Installation Of The Construction Site, Cleaning Of Surface Drainage Device (Execution, Including Side Weeding At A Width Of 0.20M And Removal Of Debris), Resin Lines Acrylic 0.6Mm Thick And Wide = 0.30M (Execution, Including Pre-Marking, Acrylic Resin Lines 0.6Mm Thick And Wide = 0.20M (Execution, Including Pre-Marking, 10M (Execution, Concrete Curb, Type Dr.Mf-01 (Execution, Including Excavation, Supply And Transport Of All Materials), Mobilization And Demobilization, Connection Painting Without Supply Of Bituminous Material (Execution, Including Transport Of Bituminous Material Within The Construction Site), Carbon Steel Plate With Reflective Film Abnt Technical Grade Type I - Octagonal Plate (Execution, Including Supply And Transport Of All Materials, Including Unsupported Post), Carbon Steel Plate With Reflective Film Technical Grade Type I From Abnt - Square Plate (Execution, Carbon Steel Plate With Reflective Film Technical Grade Type I From Abnt - Rectangular Plate (Execution, Carbon Steel Plate With Reflective Film Technical Grade Type I From Abnt - Triangular Plate (Execution, Carbon Steel Plate With Abnt Type I Technical Grade Reflective Film - Circular Plate (Execution, Including Supply And Transportation Of All Materials, Including Support Post), Surface Regularization With Motor Grader, Regularization Of The Sub-Bed (Intermediate Proctor), Deep Patch - Recomposition Of The Granular Layer With Running Spout (Execution, Including Removal Of Granular Layer And Bituminous Coating, Transport To Disposal, Removal And Loading Of Asphalt Coating In Pre-Mixed Or Hot-Machined Bituminous Concrete, Restoration Of Damaged Device With Fck Concrete Equal To 25.0 Mpa, Light Manual Mowing (Execution, Including Removal Of Material Up To 5 Km, Manual Mowing Heavy (E